Facility Needs; Purchaser Responsibility; Required Features - GE LOGIQ 180 Basic Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2317229, R
IRECTION
EVISION
Section 2-3

Facility Needs

2-3-1

Purchaser Responsibility

The work and materials needed to prepare the site is the responsibility of the purchaser. Delay,
confusion, and waste of manpower can be avoided by completing pre installation work before delivery.
Use the Pre installation checklist to verify that all needed steps have been taken. Purchaser
responsibility includes:
Procuring the materials required.
Completing the preparations before delivery of the ultrasound system.
Paying the costs for any alterations and modifications not specifically provided in the sales contract.
NOTE:
All electrical installations that are preliminary to the positioning of the equipment at the site
prepared for the equipment must be performed by licensed electrical contractors. Other
connections between pieces of electrical equipment, calibrations, and testing must also be
performed by qualified personnel. The products involved (and the accompanying electrical
installations) are highly sophisticated and special engineering competence is required. All
electrical work on these products must comply with the requirements of applicable electrical
codes. The purchaser of GE equipment must only utilize qualified personnel to perform
electrical servicing on the equipment.
The desire to use a non-listed or customer provided product or to place an approved product further
from the system than the interface kit allows presents challenges to the installation team. To avoid
delays during installation, such variances should be made known to the individuals or group performing
the installation at the earliest possible date (preferable prior to the purchase).
The ultrasound suite must be clean prior to delivery of the machine. Carpet is not recommended should
also be investigated before delivery. Dirt, static, and EMI can negatively impact system reliability
2-3-2

Required Features

Dedicated single branch power outlet of adequate amperage (see
national codes which is located less than 2.5 m (8 ft.) from the unit's proposed location.
Door opening is at least 76 cm (30 in) wide.
Proposed location for unit is at least 0.3 m (1 ft.) from the wall for cooling.
Power outlet and place for any external peripheral are within 2 m (6.5 ft.) of each other with
peripheral within 1 m of the unit to connect cables.
Power outlets for other medical equipment and gel warmer.
Clean and protected space to store transducers (in their cases or on a rack).
Material to safely clean probes (done with a plastic container, never metal).
3
Chapter 2 Pre Installation
LOGIQ™ 180 B
S
ASIC
ERVICE
Table
2-10) meeting all local and
M
ANUAL
2 - 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H41542laH41542lbH41542lcH41542ld

Table of Contents