Machine Pulling - probst TAS-UNI Translation Of Original Operating Instructions

Teleskopic screeding system
Table of Contents

Advertisement

Operation
TAS-UNI
V4
5.1.2

Machine Pulling

Fit 2 pulling chains into eyebolt (2) to pull the device by
machine. Fasten the ends of the pulling chains on the
wheel loader/excavator (near hook-in-system of shovel)
Step board (3) above the roller unit increase the pressure
to the ground (Operator can place a foot on it).
Check Fore each working with shovels, if the
handle of the shovel is fastened - danger of
Danger
accident.
Fig. 6
(2)
12/06/18
15 / 18
(3)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS-UNI and is the answer not in the manual?

Questions and answers

Table of Contents