Mechanical Installation
The 929 is a short to mid-range bar. Dependent on the application, the bar will be
mounted between 50mm and 500mm from the target surface.
The bar should be mounted securely, using all the M4 T-bolts provided with the bar.
Correct positioning of the bar is vital for effective static control. There must be no
metallic objects or obstruction between the bar and the material. The diagram shows
the area that should be kept clear.
x
Where
lengths are equal.
8