USC Surge Hopper Operator's Manual page 16

Table of Contents

Advertisement

NOTICE
The following steps outline the initial set-up of your USC
weigh hopper :
1. Clear the area of bystanders, especially small
children, before moving.
2. Be sure there is enough clearance from overhead
obstructions and power lines or other equipment to
move the machine into its working position.
3. The hopper and scale frame will arrive bolted
4
together. (Drawing A-1)
4. Separate the scale frame from the hopper assembly.
(Drawing A-2).
1
5. Assemble the load cells (according to manual shipped
with load cells) and floor mount pads (B1) using 1/2-
6
13 X 2 1/2" grade 5 bolts with a lock washer and nut.
(Drawing A-4) Note: arrow on load cell must point
down as shown in Drawing A-3.
8
4
7
2
8
7
5
8
7
Drawing A-4
Page 16
WEIGH HOPPERS & SURGE HOPPERS
WEIGH HOPPER SET-UP
USC highly recommends that the weigh hopper be set-up inside a
building or other covered structure to protect the machine from
weathering and wind.
1
6
Item #
1
2
3*
2
4
5
6
7
8
DETAIL A
DETAIL A
Drawing A-3
DETAIL A
DETAIL A
Part #
Rev
03-19-0107
A
LDCL 5000LB X4 KIT
05-03-1954
A
WDMT LDCL SUPP RL
05-08-0865
A
SHIM KIT WEIGH HOPPER LDCL RL
06-01-0027
A
BOLT .500-13 X 2.00 ZP GR5
06-01-0028
A
BOLT .500-13 X 2.50 ZP GR5
06-01-0179
A
BOLT,.500-13 CONC ANCHOR ZP 5.5 LONG
06-02-0004
A
NUT FULL .500-13 ZP GR5
06-04-0004
A
WSHR LOCK SPLT .500 ZP
Item #
Part #
Rev
1
03-19-0107
A
LDCL 5000LB X4 KIT
2
05-03-1954
A
WDMT LDCL SUPP RL
3*
05-08-0865
A
SHIM KIT WEIGH HOPPER LDCL RL
4
06-01-0027
A
BOLT .500-13 X 2.00 ZP GR5
5
06-01-0028
A
BOLT .500-13 X 2.50 ZP GR5
6
06-01-0179
A
BOLT,.500-13 CONC ANCHOR ZP 5.5 LONG
7
06-02-0004
A
NUT FULL .500-13 ZP GR5
Drawing A-1
Drawing A-2
Title
Title
Qty
1
4
1
16
16
8
32
Qty
1
4
1
16
16
8
32
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Weigh hoppeK-valve

Table of Contents