Start-Up And Operation - NetterVibration VAC Series Assembly Instructions Manual

Hide thumbs Also See for VAC Series:
Table of Contents

Advertisement

Start-up and operation

7
Start-up and operation
Observe the safety instructions in Ch. Safety, from page 5 on.
Please refer to Ch. Technical data, page 8 for permissible operating condi-
Permissible
tions.
operating
conditions
Procedure
When starting-up the VAC carry out the following steps in succession:
1.
2.
3.
4.
5.
Check that the following steps have been carried out:
Checklist
start-up
Hose connections checked before installation?
Desired frequency set?
The maximum permissible frequency must not be exceeded.
After 30 minutes of operating time:
Frequency still as set?
If necessary, adjust frequency.
After one hour of operating time:
Hose supply lines and fastening screws checked, retightened if
necessary?
Then abide to the maintenance plan.
Switch on the compressed air to supply the VAC and the vibrator.
Position the VAC at the desired location and activate the 2/2-way ball
valve on the VAC to generate the vacuum required under the suction
cup.
Check the VAC for tightness. If the VAC can be loosened by hand,
• check the mounting surface for unevenness and contamination,
• control and, if necessary, increase the pressure (e.g. with a
maintenance unit with pressure regulator).
Start the vibrator with the 3/2-way manual slide valve on the hose set.
Set the frequency of the vibrator by means of a throttle check valve
(e.g. on the hose set HG ... with DRV) so that sliding of the VAC is
prevented.
23

Advertisement

Table of Contents
loading

Table of Contents