Introduction; Receiving Inspection; Supply Conditions; Notes On Electromagnetic Compatibility - OBL X9 Series Operating Manual

Process hydraulic diaphragm metering pumps
Table of Contents

Advertisement

X9 Series metering pumps
10.1 MANDATORY DIRECTIONS FOR SENDER .................................................................................................. 37
10.2 CLEANING OF EQUIPMENT ...................................................................................................................... 37
10.3 GOODS REJECTED TO SENDER ................................................................................................................ 38
11. OVERALL AND SECTIONAL DRAWINGS ................................................................................................... 38
12. CE CONFORMITY DECLARATION ............................................................................................................. 38
1.

INTRODUCTION

GB
The machines covered by the following "instructions" are intended for operation in industrial areas and therefore cannot be
treated as products for retail (consumer).
This document therefore contains information to be used by qualified personnel only.
They must also be integrated by laws and technical regulations in force and do not replace any plant regulation provisions or
any additional requirements, either legislative or non, which have been issued for safety purposes.
1.1

RECEIVING INSPECTION

All material relative to supply is delivered to the shipper in perfect condition after thorough final testing and packaging (where
applicable). Inspect goods immediately upon receipt and check that:
the goods received correspond to the order made
-
packaging (where applicable) has not undergone damage due to transport or has not been tampered with
-
If the packaging is damaged or tampered with, immediately check (quantity, quality and form):
actual conditions of goods
-
presence of all accessories or spare parts
-
ATTENTION: Should anomalies or damage be found IMMEDIATELY ISSUE A COMPLAINT WITH THE COURIER
and inform OBL as well. We suggest contacting OBL customer support before commissioning.
1.2

SUPPLY CONDITIONS

All X9 series pumps are supplied as follows:
ready to be installed as specified in the job order
-
pre-tested in accordance with internal specifications
-
pre-painted (where applicable)
-
already equipped with lubricant oil (where applicable)
-
1.3

NOTES ON ELECTROMAGNETIC COMPATIBILITY

The L series plunger pumps, if installed properly and with direct power supply from the mains, comply with emission limits set by
regulations relating to electromagnetic compatibility (EMC - General requirements for industrial environments).
Pumps for powering by means of inverters or other electronic equipment must be especially ordered for said
use. All checks and any necessary measures to comply with emission limits set by regulations shall be at charge and
responsability of the end user.
1.4

USE IN POTENTIALLY EXPLOSIVE AREAS

STANDARD operating X9 series pumps are not suitable for use in potentially explosive areas !
WARNING: X9 series pumps for hazardous areas must be especially ordered for said use ! In potentially
explosive atmospheres must be used only ATEX execution pumps with a flameproof motor !
All pumps in ATEX execution differ from NON ATEX (or standard execution) pumps in that they are fitted with a second
identification plate with specific indication of the data required by the directive.
2.

GENERAL INFORMATION

The purpose of these instructions is to refer information deemed necessary for understanding as much as possible about and facilitating
the installation, commissioning, use and maintenance of L series version X9 hydraulic diaphragm metering pumps, hereafter
called, for short, X9 pumps.
Page 4
Copyright © - OBL Metering pumps - All rights reserved
Operating manual
File: UT-4336 – Rev.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents