Setting Up And Maintaining Schedules; Creating A Weekly Schedule - Trane Tracer UC600 Installation, Operation And Maintenance Manual

Hide thumbs Also See for Tracer UC600:
Table of Contents

Advertisement

Setting Up and Maintaining Schedules

Tracer UC600 supports three types of schedules: analog, binary, and multistate. Schedules can be
set up and maintained in Tracer TU and the Tracer TD7 Display (see "Tracer TD7 Display,
Installation, Operation, and Maintenance, "BAS-SVX50").
Schedules are based on a series of "events" that occur on each day of the week. An event is a
change in a value at a specific time that can occur during any day of the week.
Each day is independent of the others and always begins with the schedule default value. The
schedule default value is applied to each day of the week and is the value that the schedule defaults
to at 12:00 a.m. for any given day. In addition to the schedule default, a maximum of ten unique
events can be defined for each day of week.
Note: Scheduling requires installation of Tracer UC600 version 3.0 or higher firmware.

Creating a Weekly Schedule

1. Open a session of Tracer TU.
2. Select Utilities > Equipment > Scheduling.
3. Expand one of the unused Schedule boxes.
4. Click the Edit icon
Figure 30. Creating a new schedule
BAS-SVX45F-GB
on the right of the Schedule box to activate the Name and Description
fields
(Figure
30).
Configuring Tracer UC600 with Tracer TU
Name and
Description fields
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bmuc600aaa0100011

Table of Contents