8
7
D
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
C
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
B
8
7
Figure 6 – HT1 and HT2 diagram
A
Number of quantities will vary based on the enclosure sizes as per the table on prior
8
7
HEATER
BLU
HC1: GHG9710011R0002
BLK
HC2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HC1: GHG9710011R0002
BLK
HC2: GHG9710011R0008
GRN/YEL
Figure 7 – HC1 and HC2 diagram
8
7
IF 1911 • 09/20
6
HT1& HT2 WIRING DIAGRAM
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
BLK
BLU
GRN/YEL
WAGO 5-POLE
WAGO 5-POLE
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
BLK
BLU
GRN/YEL
WAGO 5-POLE
WAGO 5-POLE
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
GRN/YEL
HEATER
BLU
HT1: GHG9710011R0002
BLK
HT2: GHG9710011R0008
BLK
BLU
GRN/YEL
WAGO 5-POLE
WAGO 5-POLE
THERMOSTAT
6
5
TS -15
WAGO 5-POLE
WAGO 5-POLE
BLU
page.
HC1& HC2 WIRING DIAGRAM
6
BLU
BLK
GRN/YEL
BLU
BLK
GRN/YEL
WAGO 5-POLE
WAGO 5-POLE
THERMOSTAT
TS 30
BLU
BLU
BLK
6
5
Copyright
5
4
12. GENERAL MAINTENANCE
Personnel injury or damage to equipment can occur if all power upstream from
SynergEX panelboard is not fully disconnected prior to opening enclosure.
1.
Eaton's Crouse-Hinds Division recommends an Electrical Preventative
Maintenance Program as described in the National Fire Protection Association
Bulletin NFPA 70B: Recommended Practice for Electrical Equipment
Maintenance (www.nfpa.org).
2.
Perform visual, electrical and mechanical checks on all components on a regular
basis.
a.
b.
c.
d.
3.
If the window requires cleaning, wipe the window with a clean, damp cloth. If
this is not sufficient, use a mild soap or a liquid cleaner such as Collinite NCF or
Duco #7. Do not use an abrasive, strong alkaline or acid cleaner, as this may
result in damage.
4.
It is recommended that GFI and EPD breakers be tested monthly.
4
5.
SynergEX panelboard exterior should be dusted periodically to avoid build-up of
dust and dirt.
FUSEBLOCK
BLU
N
NNB-R
BLK
L
FNQ-R-*
13. REPLACEMENT PARTS
Ex-d components in SynergEX panelboards may only be replaced by components of
the same type (electrical ratings and mechanical size). SynergEX panelboards are
designed to provide years of reliable, trouble-free performance. However, should the
need for replacement parts arise, they are available through your authorized Eaton's
Crouse-Hinds Division distributor.
5
4
Assistance may also be obtained through your local Eaton's Crouse-Hinds Division
representative or Sales Service Department, 1201 Wolf Street, Syracuse, New York
13208, Phone (866) 764-5454.
HEATER
HC1: GHG9710011R0002
HC2: GHG9710011R0008
HEATER
HC1: GHG9710011R0002
HC2: GHG9710011R0008
FUSEBLOCK
N
NNB-R
L
FNQ-R-*
4
2020, Eaton's Crouse-Hinds Division
©
3
WARNING
!
Visually check for undue heating evidenced by discoloration of wires or
other components, damaged or worn parts, or leakage evidenced by water
or corrosion in the interior.
Check to make sure that all connections are clean and tight.
Mechanically check that all parts are properly assembled and operating
mechanisms move freely.
Ensure all insulation inside panel is properly intact.
3
2
TOLERANCES
THIS IS PROPERTY OF EATON AND CONTAINS CONFIDENTIAL AND
TRADE SECRET INFORMATION. POSSESSION DOES NOT CONVEY
UNLESS OTHERWISE SPECIFIED
ANY RIGHTS TO LOAN, SELL OR DISCLOSE SAID INFORMATION.
in.
mm
REPRODUCTION OR USE FOR ANY PURPOSE OTHER THAN WHICH
.X
IT WAS SUPPLIED MAY NOT BE MADE WITHOUT EXPRESS
±
.1
±
.3
WRITTEN PERMISSION OF EATON. THIS DRAWING IS ON LOAN
.XX
±
.01
±
.13
AND IS TO BE RETURNED UPON REQUEST.
.XXX
±
.005
±
.000
MATERIAL:
ORIGINAL DATE
ANGLES
±
1.5
±
1.5
REDRAWN DATE
DIM AND TOL IN ACCORDANCE
WITH ASME Y14.5 2009.
FINISH:
DRAWN BY
THIRD ANGLE PROJECTION
CHECKED BY
APPROVED BY
APPROVED BY
NEXT ASSY.
USED ON
APPLICATION
3
TOLERANCES
THIS IS PROPERTY OF EATON AND CONTAINS CONFIDENTIAL AND
UNLESS OTHERWISE SPECIFIED,
TRADE SECRET INFORMATION. POSSESSION DOES NOT CONVEY
UNLESS OTHERWISE SPECIFIED
ALL PRIMARY DIMENSIONS
ANY RIGHTS TO LOAN, SELL OR DISCLOSE SAID INFORMATION.
in.
mm
REPRODUCTION OR USE FOR ANY PURPOSE OTHER THAN WHICH
ARE IN
IT WAS SUPPLIED MAY NOT BE MADE WITHOUT EXPRESS
.X
±
.1
±
.3
DIMENSIONS IN [ ] ARE IN
WRITTEN PERMISSION OF EATON. THIS DRAWING IS ON LOAN
.XX
±
.01
±
.13
MILLIMETERS.
AND IS TO BE RETURNED UPON REQUEST.
.XXX
±
.005
±
.000
MATERIAL:
ORIGINAL DATE
ANGLES
±
1.5
±
1.5
REDRAWN DATE
DIM AND TOL IN ACCORDANCE
FINISH:
WITH ASME Y14.5 2009.
DRAWN BY
THIRD ANGLE PROJECTION
CHECKED BY
APPROVED BY
APPROVED BY
NEXT ASSY.
USED ON
APPLICATION
2
3
2
1
D
C
B
1
D
A
UNLESS OTHERWISE SPECIFIED,
ALL PRIMARY DIMENSIONS
ARE IN
INCHES.
DIMENSIONS IN [ ] ARE IN
MILLIMETERS.
ASSEMBLY, PANELBOARD
7/18/2019
TITLE
SINGLE & THREE PHASE
TAK
FIRST MADE FOR SSP
PSW
JAF
SIZE
CODE IDENT. NO.
0209787
REV.
D
1
SCALE 1:1
WT.
SHEET 1 OF 2
2
1
C
B
A
INCHES.
ASSEMBLY, PANELBOARD
7/18/2019
TITLE
SINGLE & THREE PHASE
TAK
FIRST MADE FOR SSP
PSW
JAF
SIZE
CODE IDENT. NO.
0209787
REV.
D
1
SCALE 1:1
WT.
SHEET 2 OF 2
1
Page 4
Need help?
Do you have a question about the Crouse-Hinds SynergEX EZFlex Series and is the answer not in the manual?