Planet Networking & Communication BSP-360 Quick Installation Manual page 11

Industrial renewable power 5-port gigabit managed switch/router with 4-port 802.3at poe+
Hide thumbs Also See for BSP-360:
Table of Contents

Advertisement

Step 2. Install battery
1 2 3 4 5 6
Bat.In/Out
1. Connect the negative electrode of the battery to the terminal for the nega-
tive electrode of the battery on the BSP-360.
2. Connect the positive electrode of the battery to the terminal for the positive
electrode of the battery on the BSP-360.
3. After the battery is well connected to the BSP-360, the PWR LED will be ON
and System LED will slowly blink.
The BSP-360 accepts the 24V DC battery system. Please pay
attention to the battery characteristics and also refer to the section
-- Recommended Settings for Different Batteries in the Quick
Installation Guide.
 Be noted for the thickness of electric wire and please refer to the
section -- Recommended Use of the Connected Wires in the
Quick Installation Guide.
 The default LVD (Low Voltage Disconnection) is set at
22.2V DC; we suggest charge the voltage of battery to 23.5V
Note
DC or above for the BSP-360.
Check the total power consumption of your connected network
device before installation. Improper battery capacity could shorten
the battery life or make your network device lack of power supply.
Please link PLANET Download Center and download BSP360-
PV&BAT_calculation. The calculation list can help you to select
solar panel and battery. Refer to Setion 6 customer support.
Note
D C
D C
Battery
11

Advertisement

Table of Contents
loading

Table of Contents