Page 1
Fig 3 LAMP INSTALLATION 1. Remove the 6 screws on the front cover (The one with the S300 FX logo). Put aside. 2. Remove the BLUE END CAP lamp from packaging. NOTE: use the gloves provided. 3. Insert the lamp in the second clamp and tighten.
Page 2
The VOC controller (Fig 2) should be installed on the wall, at 12 inches from the ceiling where the smoke accumulate. The S300 unit comes with 20ft of wire (Fig3) to link the controller box to the unit. If 20 ft not long enough, you can replace it with BX wiring with 3 wires.
Page 3
VOC SENSOR Remove the cover. Connect the 3 wires from the sensor to the same color wiring setting screw: coming from the unit. Use the wire connectors (marrettes) triggers at included. 3.4 V DC Positive PROCESS: When the unit turns on, the GREEN LED flashes for a 5 minutes preheat time.
Page 4
The S300 unit runs continuously, so its regular lamp purifies the air constantly. This dual zone lamp (UVC / UVV) is sufficient when there are only one or two smokers.
Need help?
Do you have a question about the S300 and is the answer not in the manual?
Questions and answers