3. List of parts for replacement .......................................................................................................................................... 2
5.1 Open the SRMax ballast box .................................................................................................................................... 4
5.2 Test UV lamp continuity ........................................................................................................................................... 4
1. Tools required for troubleshooting Phillip screwdriver Ohmmeter 5/16” nutdriver 2. Identifying internal components inside SRMax To access internal components of the SRMax, remove cover by following the Step-by-step instructions. Ballast Ballast to lamp connection Thermistor Circuit board to Circuit board...
(power - Test lamp continuity (refer to lamp supply) test procedure) - Defective lamp - Contact Sanuvox to replace UV lamp - Defective ballast - Contact Sanuvox to replace ballast Status LED is Red - Thermistor is not connected...
WARNING 5.1 Open the SRMax ballast box Step 1. Take the SRMax out from the ductwork by removing the 4 screws located on the cover (4 corners) that hold it to the frame 2. Place the SRMax down on a flat surface,...
5.3 By-pass circuit board (test ballast and UV lamp together) Step 1. Open the SRMax ballast box Refer to instructions above 2. Unplug from the circuit board the line (black) from the power cord. See picture to the left.
Step 1. Open the SRMax ballast box Refer to instructions above 2. Plug in the SRMax to a power source and turn ON the unit by pressing the power button. In the first 5 seconds from powering the unit ON, click the Reset button once. By doing so, you’ll see the status LED turn Blue meaning the...
Need help?
Do you have a question about the SRMax and is the answer not in the manual?
Questions and answers