Necessary Tools; System Description - OBO Bettermann SLM50 Mounting Instructions

Table of Contents

Advertisement

4
5
No
Direct ceiling mounting with head plates
Direct ceiling mounting with mounting angles
Mounting in a direct run below the ceiling opening with
transverse profiles
Mounting in a direct run below the ceiling opening with
lengthwise profiles
SLM50 suspended vertical ladders for the maintenance of electrical function

Necessary tools

List of required tools:
– Angle grinder
– Drill
– Linear laser; spirit level
– Wrench set
– Ladder
– Roller scaffolding or work platform

System description

The SML50C40F.. vertical ladders, with a max. width of 600 mm, can be
used as standard support structures in the mounting variants, according
to the surveyors' reports, as suspended rising sections for the mainten-
ance of electrical function (E30–E90).
The suspended mounting of the vertical ladder can be performed regard-
less of the structure or type and of the distance to the wall. For this, the
vertical ladders are mounted flush to solid ceiling structures. Depending
on the mounting version, the maximum storey height may not exceed
3.5 m or 7.0 m.
Fig 1: Overview, mounting variants
Mounting variant
Tab 1: Overview, mounting variants
Necessary tools
Suitable for storey heights
≤ 3 5 m
> 3 5 m – ≤ 7 0 m
7 | EN

Advertisement

Table of Contents
loading

Table of Contents