OBO Bettermann SLM50 Mounting Instructions page 19

Table of Contents

Advertisement

Note!
SLM50 suspended vertical ladders for the maintenance of electrical function
Mounting vertical ladders up to a max storey height of 3 5 m
6. Run the threaded rod through the lower side of the upper U support
and screw tight from above using an M12 washer and M12 nut.
7. Lock from below with the previously screwed-on nut and washer.
8. Repeat steps 5–7 with the second threaded rod.
9. With the open sides facing each other, mount the head plates on the
threaded rods, using 1 M12 washer and 2 M12 nuts each.
Fig 18: Mounting head plates on the floor
The head plates must be mounted vertically under the head plates under
the ceiling.
10. With the open sides facing each other, mount the head plates on the
floor, using 1 M12 truss-head bolt each on the U supports.
Fig 19: Mounting ladder rails under the ceiling
19 | EN