Accessories; Mounting; Preparations For Mounting - OBO Bettermann SLM50 Mounting Instructions

Table of Contents

Advertisement

Mounting

5 2
6
WARNING
6 1
Note!
CAUTION
10 | EN

Accessories

Designation
Figure
U support connector
VUS 5
Clamp clip
2056U M
KS-E identification
plate
Tab 6: Accessories
Mounting
The SLM50 vertical ladder is supplied unmounted. With all mounting vari-
ants, the ladder rails are first mounted to the ceiling fastening and then
the ladder rungs for cable fastening inserted.
Risk of injury!
The size and weight of the components can cause injuries. Do not mount
suspended vertical ladders on your own and use roller scaffolding or a
raised platform or mounting lift. Wear personal protective equipment.

Preparations for mounting

Before mounting, the ladder rails must be cut according to the storey
height.
At a storey height of 3–6 m, 2 U support connectors are required. At a
storey height of 6–7 m, 4 U support connectors are required. Along the
length of the ladder rails, reckon with a gap of 13 mm per pair of connect-
ors.
Risk of cutting
During cutting work, metal chips or sharp cut edges can cause injuries to
eyes and hands!
– Wear protective glasses and gloves.
– Deburr cut edges.
1. Cut vertical ladders to the desired length, e.g. using an angle grinder.
2. Deburr cut edges.
Function
Connect 2 vertical ladders at a storey
height > 3 m.
Cable fastening on the suspended
vertical ladder.
Identification of the cable system
according to DIN 4102-12
OBO Bettermann

Advertisement

Table of Contents
loading

Table of Contents