  • Page 1 Mounting instructions SLM50 suspended rising sections for the maintenance of electrical function to DIN 4102 Part 12...
  • Page 2 SLM50 suspended rising sections for the maintenance of electrical function Mounting instructions © 2021 OBO Bettermann Holding GmbH & Co. KG...
  • Page 3: Table Of Contents

    7.2 Mounting the strain relief ......33 Retrofitting Checking and maintaining the system 10 Dismantling the system 11 Disposing of the system 12 Technical data SLM50 suspended vertical ladders with maintenance of electrical function 3 | EN...
  • Page 4 Table of contents 4 | EN OBO Bettermann...
  • Page 5: About These Instructions

    – Surveyor's report no. GA-2020/044 (IBB) for standard support struc- ture according to DIN 4102 Part 12 for cable routing on suspended rising sections – General construction test certificates of the cable manufacturers SLM50 suspended vertical ladders for the maintenance of electrical function 5 | EN...
  • Page 6: Correct Use

    – The inclusion in the equipotential bonding of the overall system must be performed by specialist personnel. Personal protective equipment List of personal protective equipment to be used: Use hand protection Wear safety shoes Wear eye protection Wear head protection 6 | EN OBO Bettermann...
  • Page 7: Necessary Tools

    Mounting in a direct run below the ceiling opening with transverse profiles Mounting in a direct run below the ceiling opening with lengthwise profiles Tab 1: Overview, mounting variants SLM50 suspended vertical ladders for the maintenance of electrical function 7 | EN...
  • Page 8: System Overview

    System description System overview Fig 2: Overview of system components SLM50 C... F vertical ladder KUS 5 NOK head plate GMS 3 VW 90 mounting bracket KUS 5 head plate US7 U support M12 threaded rod M12 anchor, fire protection-tested (e.g.
  • Page 9: Mounting Variant 1: Direct Mounting With Head Plate

    Tab 5: System components, variant 4 * If suspended vertical ladders are installed across multiple storeys, then fewer U supports are required for the installation from the 2nd storey. SLM50 suspended vertical ladders for the maintenance of electrical function 9 | EN...
  • Page 10: Accessories

    DIN 4102-12 Tab 6: Accessories Mounting The SLM50 vertical ladder is supplied unmounted. With all mounting vari- ants, the ladder rails are first mounted to the ceiling fastening and then the ladder rungs for cable fastening inserted. Risk of injury! WARNING The size and weight of the components can cause injuries.
  • Page 11: Mounting Vertical Ladders Up To A Max Storey Height Of 3 5 M

    Fig 4: Mounting head plates 4. Mount head plates with the open sides facing each other, using one M12 anchor for the ceiling and one for the floor. SLM50 suspended vertical ladders for the maintenance of electrical function 11 | EN...
  • Page 12 If there is a fire, the material of the vertical ladders expands. Do not bolt the vertical ladder to the floor. Maintain a minimum distance of 40 mm between the end of the ladder rail and the floor. Fig 6: Moveable bearing on the floor 12 | EN OBO Bettermann...
  • Page 13: Mounting The Ladder Rails With A Mounting Bracket

    4. Mount the installation profiles with 1 M12 anchor on the ceiling and floor. – Mount the installation profiles with the short side on the ceiling and floor. – Mount the installation profiles with the long side inward. SLM50 suspended vertical ladders for the maintenance of electrical function 13 | EN...
  • Page 14 If there is a fire, the material of the vertical ladders expands. Do not bolt the vertical ladder to the floor. Maintain a minimum distance of 40 mm between the end of the ladder rail and the floor. Fig 10: Moveable bearing on the floor 14 | EN OBO Bettermann...
  • Page 15: Mounting The Ladder Rails With Transverse Profiles

    4. Mount the U supports in parallel to the vertical ladder, each with 2 M12 anchors. Fig 12: Mount head plates under the ceiling. Note! The threaded rods must be mounted at a spacing of “a” to each other. a = vertical ladder width – 50 mm. SLM50 suspended vertical ladders for the maintenance of electrical function 15 | EN...
  • Page 16 The head plates must be mounted vertically under the head plates under the ceiling. 10. With the open sides facing each other, mount the head plates on the floor, using 1 M12 truss-head bolt each on the U support. Fig 14: Mounting ladder rails under the ceiling 16 | EN OBO Bettermann...
  • Page 17 Maintain a minimum distance of 40 mm between the end of the ladder rail and the top side of the transverse profile. Fig 15: Moveable bearing on the floor SLM50 suspended vertical ladders for the maintenance of electrical function 17 | EN...
  • Page 18: Mounting The Ladder Rails With Lengthwise Profiles

    4. Mount the U supports at a 90° angle to the vertical ladder, each with 2 M12 anchors. Fig 17: Mounting head plates 5. Run the first threaded rod through the lower U support and up to the ceiling opening and screw on the M12 nut and M12 washer. 18 | EN OBO Bettermann...
  • Page 19 10. With the open sides facing each other, mount the head plates on the floor, using 1 M12 truss-head bolt each on the U supports. Fig 19: Mounting ladder rails under the ceiling SLM50 suspended vertical ladders for the maintenance of electrical function 19 | EN...
  • Page 20 Do not bolt the vertical ladder to the floor. Maintain a minimum distance of 40 mm between the end of the ladder rail and the top side of the lengthwise profile. Fig 20: Moveable bearing on the floor 20 | EN OBO Bettermann...
  • Page 21: Mounting Vertical Ladders Up To A Max Storey Height Of 7 0 M

    Fig 22: Mounting head plates 4. Mount head plates with the open sides facing each other, using 1 M12 anchor for the ceiling and 1 for the floor. SLM50 suspended vertical ladders for the maintenance of electrical function 21 | EN...
  • Page 22 If there is a fire, the material of the vertical ladders expands. Do not bolt the vertical ladder to the floor. Maintain a minimum distance of 70 mm between the end of the ladder rail and the floor. Fig 24: Moveable bearing on the floor 22 | EN OBO Bettermann...
  • Page 23: Mounting The Ladder Rails With Transverse Profiles

    Fig 25: Mounting transverse profiles 4. Mount the U supports in parallel to the vertical ladder, each with 2 M12 anchors. Fig 26: Mounting head plates Note! The threaded rods must be mounted at a spacing of y – x – y to each other. x = vertical ladder width – 150 mm; y = 100 mm. SLM50 suspended vertical ladders for the maintenance of electrical function 23 | EN...
  • Page 24 The head plates must be mounted vertically under the head plates under the ceiling. 10. With the open sides facing each other, mount the head plates on the floor using 1 M12 truss-head bolt each on the U support. Fig 28: Mounting ladder rails under the ceiling 24 | EN OBO Bettermann...
  • Page 25 Do not bolt the vertical ladder to the floor. Maintain a minimum distance of 70 mm between the end of the ladder rail and the top side of the trans- verse profile. Fig 29: Moveable bearing on the floor SLM50 suspended vertical ladders for the maintenance of electrical function 25 | EN...
  • Page 26: Mounting The Ladder Rails With Lengthwise Profiles

    5. Run the first threaded rod through the lower U support and screw on the M12 nut and M12 washer. 6. Run the threaded rod through the lower side of the upper U support and screw tight from above using an M12 washer and M12 nut. 26 | EN OBO Bettermann...
  • Page 27 – Mount the rails with the open sides facing each other. – Place the bolts up to the limit in the slot, in order to prevent a verti- cal movement of the vertical ladders. SLM50 suspended vertical ladders for the maintenance of electrical function 27 | EN...
  • Page 28 Do not bolt the vertical ladder to the floor. Maintain a minimum distance of 70 mm between the end of the ladder rail and the top side of the lengthwise profile. Fig 34: Moveable bearing on the floor 28 | EN OBO Bettermann...
  • Page 29: Mounting Ladder Rungs

    Fig 35: Mounting ladder rungs 1. Insert the ladder rungs into the ladder rails at a distance of 300 mm from the interior. 2. Mount with 2 truss-head bolts each. SLM50 suspended vertical ladders for the maintenance of electrical function 29 | EN...
  • Page 30: Mounting U Support Connectors

    – Mount the rails with the opening pointing inwards. – Place the bolts up to the limit in the slot, in order to prevent a verti- cal movement of the vertical ladders. Note! The maximum distance between the ladder rungs above and below the U support connector is 300 mm. 30 | EN OBO Bettermann...
  • Page 31: Fastening Cables

    1. Clearly fill out the KS-E identification plate with a permanent marker. 2. Stick the KS-E identification plate to the ladder rail of the suspended vertical ladder. SLM50 suspended vertical ladders for the maintenance of electrical function 31 | EN...
  • Page 32: Additional Required Measures

    Additional required measures Additional required measures Closing ceiling openings with insulation After mounting, the ceiling opening must be closed off with appropriate fire insulation. Note! For more information on mounting the fire insulation, see the mounting instructions of the appropriate insulation system. Fig 38: Fully mounted strain relief on suspended vertical ladder 32 | EN OBO Bettermann...
  • Page 33: Mounting The Strain Relief

    From storey heights of 3.5 m, the ZSE90... LH strain relief must be mounted as an effective support measure for suspended rising sections. Note! For more information on the mounting of the ZSE90...LH strain relief, see the ZSE90 mounting instructions. Fig 39: Fully mounted strain relief on suspended rising section SLM50 suspended vertical ladders for the maintenance of electrical function 33 | EN...
  • Page 34: Retrofitting

    If the system was subjected to fire damage, then the complete system must be removed and disposed of. We recommend obtaining the advice of the local fire damage restorer during disposal. 34 | EN OBO Bettermann...
  • Page 35: Technical Data

    2056U M 64 FT 1158104 Clamp clip – 2056U M 70 FT 1158112 Clamp clip – 2056U M 76 FT 1158120 Clamp clip – Tab 7: Technical data SLM50 suspended vertical ladders for the maintenance of electrical function 35 | EN...
  • Page 36 OBO Bettermann Holding GmbH & Co. KG P.O. Box 1120 58694 Menden GERMANY Customer Service Germany Tel.: +49 (0)2373 89-1700 Fax: +49 (0)2373 89-1238 E-mail: info@obo.de www.obo-bettermann.com...