The table below indicates the estimated length of time needed to install the main
unit and optional accessories from the time the machine is unpacked to when it is
installed, and calculated from the average amount of manpower hours. The
estimated installation times are based on a minimum of two experienced
technicians.
imagePRESS C6000 – Main Unit
POD Deck-A1
Secondary POD Deck-A1
Paper Deck-AC1
High Capacity Stacker-C1
Professional Puncher-B1 + Professional Puncher Integration Unit-A1
Finisher-AB1/Saddle Finisher-AB2
Booklet Trimmer-C1
Color Image Reader-H1
DADF-R1
Document Insertion Unit-C1
Perfect Binder-B1
Stack Bypass-A1

8.2 Customer Responsibilities

Identify location for equipment.
Verify strength of floor and level.
Ensure that the equipment can be
delivered to the site.
Confirm proper electrical outlets and
power are available.
Area meets environmental
specifications.
Network connections available.
Version 5
Description
Item
imagePRESS C6000 Customer Expectations Document
Comment
Area meets space and service space requirements.
Certified by structural engineers.
Path is clear and unobstructed.
Dedicated power, and enough outlets for equipment
(including accessories).
Temperature and humidity are within specifications,
venting provided if necessary.
If desired.
Estimated Time
120 Minutes
40 Minutes
50 Minutes
14 Minutes
30 Minutes
17.5 Minutes
30 Minutes
45 Minutes
30 Minutes
20 Minutes
25 Minutes
60 Minutes
14 Minutes