Installation Step Diagram
1. Flush box install.
3. The upper part of the panel is
2. Base flush box depth adjustment hook.
stuck in, then move the panel to
the flush box.
2.2CM
2.2CM
4. Move the slider of the panel and fix the two screws. When installing, pay attention to
the reservation of the 2.2 cm space around the door to move the slide cover.
Page 23