Epever SolarV AN Series User Manual page 22

Tracer an series - mppt solar charger controller
Table of Contents

Advertisement

Voltage>Boost Reconnect Charging Voltage;
Ⅲ. Low Voltage Reconnect Voltage > Low Voltage Disconnect Voltage ≥ Discharging Limit
Voltage;
Ⅳ. Under Voltage Warning Reconnect Voltage > Under Voltage Warning Voltage ≥ Discharging
Limit Voltage;
Ⅴ. Boost Reconnect Charging voltage > Low Voltage Reconnect Voltage;
Ⅵ. Low Voltage Disconnect Voltage ≥ Over discharging protection voltage
(PCM)+0.2V;WARNING: The required accuracy of PCM shall be at least 0.2V. If the deviation
is higher than 0.2V, the manufacturer will assume no liability for any system malfunction
caused bythis.
4)
Local load mode
Operation:
Step1: Press the "ENTER" button and hold 5s under the load mode interface. Step2: Press the "SELECT"
button when the load mode interface is flashing. Step3: Press the "ENTER" button to confirm the load
mode..
NOTE:Please refer to chapter 4.2 for the load working modes.
①Load working mode
1**
100
Light ON/OFF
Load will be on for 1 hour after sunset
101
Load will be on for 2 hours after
102
sunset
103
Load will be on for 3 ~ 13 hours
after sunset
113
Load will be on for 14 hours after
114
sunset
Load will be on for 15 hours after
115
sunset
116
Test mode
Manual mode(Default load ON)
117
CAUTION: Please set Light ON/OFF, Test mode and Manual mode via Timer1. Timer2 will
bedisabled and display "2 n "
www.solarv.de
Timer 1
19
2**
2 n
Disabled
Load will be on for 1 hour before
201
sunrise
Load will be on for 2 hours before
202
sunrise
203
Load will be on for 3 ~ 13 hours
before sunrise
213
Load will be on for 14 hours before
214
sunrise
Load will be on for 15 hours before
215
sunrise
2 n
Disabled
2 n
Disabled
Copyright © 2021 SolarV GmbH All rights reserved
Timer 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solarv 1210anSolarv 2210anSolarv 3210anSolarv 4210an

Table of Contents