3

Installation

This chapter describes the installation of the TA7104i.

Planning the Installation

3.1
Before installing the TA7104i, you should complete the following tasks:
Create a network diagram (see section "Network Diagram").
Gather IP-related information (see section "IP-Related Information" for more information).
Install the hardware and software needed to configure the TA7104i
(see section"Network Information").
Installation Checklist
The installation checklist lists the tasks for installing the TA7104i. Print a copy of this checklist and
mark the entries as you complete each task. Include the completed checklist in your site log.
Figure 3: Installation Checklist
TA7104i name/serial number
Task
Network information available &
recorded in site log
Environmental specifications
verified
Site power voltages verified
Installation site pre-power check
completed
Required tools available
Additional equipment available
TA7104i received
Quick start guide received
© 2014 Aastra Sweden | 154_1531 ANF 901| A | 2014-05-15
Verified By
10
TA7014i Hardware Installation
Date

Advertisement

Table of Contents
loading

Related Products for Aastra TA710i

Table of Contents