Transport and storage
9.3.2
Connecting the analyzer
106
8. Fill the combustion tube and install the combustion tube in the combustion furnace
(see sections "Filling the combustion tube" p. 75 and "Inserting the combustion tube"
p. 76).
9. Install the TIC condensate container and condensation coil (see section "Installing the
TIC condensate container and condensation coil" p. 81).
10. Place the reagent bottle with the drip tray into the analyzer.
11. Close the doors of the analyzer.
12. Position any add-on devices at the intended location and connect them. Observe in
this regard the user manuals of the add-on devices.
The mains connection and media connections are on the analyzer backplate:
1
Connection of the neutral conductor at the sampler
2
Main switch to switch the analyzer on and off
3
Holder for mains fuse
4
Mains connection
5
Gas connection "analyte" (connected to gas
connection "internal" via a hose bridge)
6
Gas connection "CLD/pump!
7
Gas connection "internal"
8
Connection NPOC purging gas "NPOC"
Fig. 35
Mains connection and gas connections at the multi N/C 2100S
9
Carrier gas connection "O
/Air"
2
10 Connection for auxiliary gas for pneumatically
connected locks "aux gas"
11 Waste "waste"
12 RS 232 interface for the sampler "sampler"
13 RS 232 interface for CLD and HT module "CLD/HT"
14 USB port for PC "PC"
multi N/C 2100S
Need help?
Do you have a question about the Analytik Jena multi N/C 2100S and is the answer not in the manual?