Lithium ion handle and usb charging accessory (346 pages)
Summary of Contents for Hillrom Connex Spot Monitor 7000 Series
Page 1
Delivery Assist Program – Work Instructions Device: Connex Spot Monitor (CSM) 7000 series For Product Information – please visit: Connex Spot Monitor (CSM) WI_Delivery Assist Trng CSM - DIR 50011929 ver F_2020-12-21...
Page 2
Tool Requirements – to perform this process you will need the following: Electrical Safety Tester – You will need to source the following Ground Stud Connector to perform this test for Orders with 7000-APM stands – it can be ordered in the HRC Parts-On-Line System under Alpha code DGTF Screwdrivers - specifications for screwdrivers are noted on each installation instruction sheet.
Page 3
1.1. Compare number of delivered devices and number of delivered mounting options with order info – Order Acknowledgement will be emailed to the HRC Delivery Assist mailbox (deliveryassistwa@hillrom.com) and the HRC Regional Service Operations Manager will provide you with the documentation prior to the install.
Page 4
4. Assembly & Mounting – There are 2 options for Mounting Service offered for CIWS, CVSM and CSM - DELIVERYASSIST-2 - DO NOT DRILL THE WALLS - Follow mounting instructions starting at 4.1 Service offered for CIWS, CVSM and CSM - DELIVERYASSIST-INS – Drilling walls is permitted. Follow mounting instructions starting at 5.1 Assembly &...
Page 5
5. Assembly & Mounting – Option DELIVERYASSIST-INS – Drilling Walls is Permitted 5.1. Depending on the supplied mounting option, select one of the following 5 mounting instructions – 5.1.1. Assemble the Accessory Power Management (APM) #7000-APM roll stand following the instructions in the 7000-APM Assembly guide 5.1.2.
Page 6
7. Electrical Safety testing 7.1. EST of the CSM without the APM is not required 7.2. EST of the CSM including the APM is required - Refer to DIR# 20014129 – EST Excel document 7.3. Open the Excel document titled “20014129 – Electrical Safety Testing ”...
Page 7
8. Power-on test 8.1. Plug the mains cable into a wall outlet 8.2. Confirm power led on the CSM is amber or green 8.3. Press the power button on the CSM to power-on the device and confirm there are no POST (Power On Self-Test) errors 8.3.1.
Page 8
13.2. After all devices have been processed, sign the Check List, and ask the customer to countersign 13.3. Leave a copy for the customer records. Send your copy to deliveryassistwa@hillrom.com. 722060 / 80018967 - (7000-APM) Assembly instructions 721960 / 80019118 - (7000-MS3) - Classic MS3 Mobile stand assembly instructions DU-WA-0015-01 7000-GCX Installation Guide –...
Need help?
Do you have a question about the Connex Spot Monitor 7000 Series and is the answer not in the manual?
Questions and answers