Adjustment Of The Machines Effected By A Service Technician During The First Setting In Operation; Commissioning - Meiko WS 125 M Translation Of Original Operating Instructions

Table of Contents

Advertisement

The electrical connection data, voltage, type of current, output can be seen on the type
plates on the machine.
Please check the voltage.
Route all electrical cable connections through the marked cable gland to the intended ter-
minals and contactors in the electrical cabinet and connect to the intended terminals and
contactors.
8 Adjustment of the machines effected by a service technician during
the first setting in operation
8.1

Commissioning

To avoid damages or dangerous injuries during the setting in operation of the washing
machine, please observe the following points:
Perform any required initial checks on supplied parts, such as heat pumps or other units.
More detailed information, if required, can be found in the relevant operating instructions.
 The setting in operation must be executed by qualified personnel under consideration
CAUTION!
 Before the first start, check if all tools and foreign parts are removed out of the installa-
 Check any escaped fluids have been removed.
 Activate all the safety systems and door switches before commissioning.
 Check that all screw connections are tight.
 Please also read the chapter "General safety instructions".
Commissioning and training will be handled and provided by MEIKO-trained service engi-
neers. The operator must not use the installation before completing training.
Caution:
The pre-fuse in the building must be chosen to meet local requirements
and match the nominal machine current in order to provide back up- pro-
tection (VDE 0100 for Germany).
The mains supply cable must be provided with fuses in accordance with
regulations and must have a main switch (accessible on site or on the
appliance for operating personnel). If the neutral line (N) is not earthed,
you must use a 4-pin master switch. Mains connecting leads must be
oil-resistant, shielded cables no lighter than an H 07 RN-F cable.
The potential equalisation connection must be carried out in accordance
with the requirements of the local electricity supply company and all ap-
plicable local regulations (in Germany VDE 0100 Part 540 must be ob-
served).
VDE 0160/EN 50178 specifies that within electrical equipment featur-
ing/planning residual current devices on the grid side to install AC/DC
sensitive type B FC frequency converters upstream of the installed type
A FC frequency converters- must be used.
A 5-pin terminal rail is provided for the mains connection (L1, L2, L3, N,
PE).
of the safety standards.
tion.
13 / 32
9648649

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ws 125 lWs 125 xl

Table of Contents