Installation; Changing The Installation Location - Landis+Gyr ULTRAHEAT T450 Technical Description

Static heat and cooling meter t450 residential; local and district heating
Hide thumbs Also See for ULTRAHEAT T450:
Table of Contents

Advertisement

Installation

5
Installation

Changing the installation location

Note: For a heat meter
cold side installation location corresponds to the return
the hot side installation location to the flow
Note: For a cooling meter
corresponds to the return
tion to the flow
Proceed as follows to install the meter:
Compare the installation location with the symbol on the LCD (
necessary, adjust the installation location of the meter to match the condi-
tions (see chapter "Changing the installation location").
Note the dimensions of the meter and check whether there is sufficient free
space.
Flush the system thoroughly before installing the meter.
Install the meter vertically or horizontally between two gate valves so that
the arrow on the body matches the flow direction. Please note the following
installation examples.
Install the temperature sensors in the same circuit as the meter.
Seal temperature sensors and screw connections to prevent manipulation.
Remove the rubber band from the volume measuring part. During opera-
tion, the temperature sensor cable and control line should not be in direct
contact with the volume measuring part.
If you install the meter as a cooling meter, follow the corresponding instruc-
tions.
Recommendation: If you install several meters, the same installation condi-
tions should apply to all meters.
Note: The installation location can be changed in the field if this
function has been enabled at the factory. This function locks after 5
changes and can then no longer be used. The entries can be
checked via the LCD loop "LE".
Note: Alternatively, you can change the installation location using
UltraAssist.
Note: If the
not available.
For meters with an adjustable installation location, the installation location can
be determined manually. Proceed as follows:
Press and hold the Service button (for more than 3 seconds) until "Para"
appears on the LCD.
Press button 2 briefly until
Press button 1 briefly several times until
or combined heat / cooling meter, the
, the hot side installation location
and the cold side installation loca-
.
symbol is not displayed, this function is
appears on the LCD.
10/36
and
.
or
). If
appears on the LCD.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultracold 450

Table of Contents