Filling Level Correction For Longer Service Hoses - Waeco AirCon ServiceCenter Operating Manual

Service unit
Table of Contents

Advertisement

VAS 581 001A
"Service completed" displays the amount of service work performed
using the air conditioning service unit since the last reset (see date).
9.8

Filling level correction for longer service hoses

I
NOTE
 If longer or shorter service hoses are required for the device, you
need to adjust the filling quantities to the new hose lengths.
 The service hoses for the high and low pressure sides must always
be of the same length, as otherwise the filling quantities will not be
correctly measured.
1. In the basic menu, use the cursor keys  or  to select "Other
selections":
2. Press ENTER to confirm.
3. Use the cursor keys  or to select  "Service":
4. Press ENTER to confirm.
5. Enter the password "7732".
6. Enter the hose length in centimeters.
7. Press ENTER to confirm.
Service performed:
Qty
STOP-EXIT
Short selection
Free selection
Other selections
ENTER-OK
Int. vessel filling
Flushing
Reset scales.
Service.
Service tasks
03/07/17
4
59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vas 581 001a

Table of Contents