8. Execution of search and installation
"CP210x USB to UART Bridge Controller" is searched
and installed for automatically.
9. Completion of installation
Installation of "CP210x USB to UART Bridge Cont-
roller" completes.
Terminate the hardware search wizard by clicking the
[Complete] button.
10. Preparation for use of the UBS driver was completed.
A message stating ready for use appears in the right
lower part of the screen.
38
3. Driver installation
[Software]
Need help?
Do you have a question about the LD-18 and is the answer not in the manual?