Download Print this page

ParaBody Serious Steel Pro System Assembly Instructions Manual page 8

Advertisement

5
FIGURE 8
STEP 8:
• LOOSELY assemble the TOP BOOM (2) to the UPRIGHT FRAME (1) using two 1/2 X 3" BOLTS (27), one 3/8 X 2-3/4"
BOLT (28), one 1/2" LOCK WASHER (32), one 1/2" WASHER (30), one 1/2" LOCKNUT (34), and one 3/8" LOCKNUT (36)
as shown in FIGURE 8.
1/2 X 3" 27
30
5
FIGURE 9
STEP 9:
• LOOSELY assemble the LEFT (7) & RIGHT (8) BOOM SUPPORTS to the UPRIGHTS (5) and TOP BOOM (2) using four 1/2
X 3" BOLTS (27), two 1/2 X 3-1/4" BOLTS (26), two 1/2" LOCK WASHERS (32), two 1/2" WASHERS (30), and four 1/2"
LOCKNUTS (34) as shown in FIGURE 9.
* SECURELY TIGHTEN ALL LOOSE CONNECTIONS MADE UP TO THIS POINT!
1/2
0
2
1/2 X 3" 27
32
7
34
34
1/2
1/2
1
2
Route CABLE
over bolts.
28 3/8 X 2-3/4"
26 1/2 X 3-1/4"
2
Route CABLE
over bolts.
8
34
1/2
1/2
3
4
8
27 1/2 X 3"
32
34
30
36
1
1
32
27 1/2 X 3"
30
1/2
5
6

Advertisement

loading

This manual is also suitable for:

893103