Download Print this page

ParaBody Serious Steel Pro System Assembly Instructions Manual page 16

Advertisement

STEP 22
• Wrap the PEC DEC CABLE (24) around one 3-1/2" PULLEY
(23) and assemble the PULLEY to the PULLEY BRACKET
(11) using one 3/8 X 2" BOLT (29) and one 3/8" LOCKNUT
(36) as shown in FIGURE 22.
FIGURE 23
STEP 23:
Insert each end of PEC CABLE (24) into the bushings on the cams of the LEFT (15) & RIGHT (14) PEC ARMS, then drape the
CABLE over the PULLEYS assembled to the CENTER PULLEY BRACKET (16). See FIGURE 23 & 893103 CABLE DIA-
GRAM on PAGE 12.
• After CABLE (18) has been routed over the PULLEYS on the CENTER PULLEY BRACKET (16), position CABLE RETAIN-
ING CLIPS (56) at a 45
1/2
0
o
angle over the PULLEYS and SECURELY tighten.
1/2
1
2
3/8 X 2" 29
1/2
1/2
3
16
23
11
16
56
14
1/2
1/2
4
5
36
24
FIGURE 22
24
6

Advertisement

loading

This manual is also suitable for:

893103