FIGURE 14
STEP 14:
• SECURELY assemble the BEARING HOUSING (13) and the CENTER PULLEY BRACKET (16) to the UPRIGHT FRAME (1)
using two 1/2 X 3-1/4" BOLTS (26) and two 1/2" LOCKNUTS (34) as shown in FIGURE 14.
STEP 15:
Insert four 2" SQ. END CAPS (47) into the LEFT (15) & RIGHT (14)
PEC ARMS as shown in FIGURE 15.
• Slide two 4 X 12" ROLLER PADS (21) onto the LEFT (15) & RIGHT
(14) PEC ARMS as shown in FIGURE 15. (TIP: Spray window
cleaner on the inside of the roller pad to help ease assembly.)
13
26 1/2 X 3-1/4"
1
15
21
47
FIGURE 15
11
34
16
47