Download Print this page

ParaBody Serious Steel Pro System Assembly Instructions Manual page 17

Advertisement

3/8 X 2-3/4" 28
FIGURE 24
STEP 24:
• Route the CABLE (25) under the 3-1/2" PULLEY in the slot on the FRONT UPRIGHT (1) and around the 3-1/2" PULLEY shown
on FIGURE 24. (NOTE: Make sure CABLE (25) is underneath the CABLE RETAINING CLIP.)
• SECURELY assemble one 3/8 X 2-3/4" BOLT (28) to the UPRIGHT FRAME (1) using two 3/8" WASHERS (31), and one 3/8"
LOCK NUT (36). (NOTE: Make sure CABLE is between the 3/8 X 2-3/4" BOLT and the 3-1/2" PULLEY.)
31
17
25
1
36

Advertisement

loading

This manual is also suitable for:

893103