Smart Grid (For Split) - LG THERMA V Installation Manual

Air-to-water heat pump
Hide thumbs Also See for THERMA V:
Table of Contents

Advertisement

ACCESSORIES INSTALLATION
126

Smart Grid (For Split)

This product provides SG function for users. It enables to stop internal operation(Heating / DHW)
and control target temperature depending on input signal from power provider.
How to install smart grid
Follow below procedures step 1 ~ step 3.
Step 1. Check if the power of the unit is turned off.
Step 2. Disassemble front panels and distinguish terminal block in Indoor PCB.
Step 3. Connect signal cable to terminal block in PCB (TB_SG2, TB_SG1) fully as shown below.
Heating and DHW Operation depend on input signal(SG1 / SG2)
Input Signal
Status
display
SG1
SG2
SGN
Open
Open
SG1
Close
Open
SG2
Open
Close
SG3
Close
Close
Indoor PCB
Cost
Command
(Electric)
Normal
Normal
Operation
Price
Operation
High
Off
Price
(Utility lock)
Operation On
Low
Recommend
Price
Operation On
Very Low
Commend
Price
TB_SG2
Operation
Heating
Maintain operation
status
Forced internal
operation off
Target temperature
change automatically
depend on SG Mode
value in installer setting
- Step 0 : maintain
target temperature
- Step 1 : increase 2 °C
from target
temperature
- Step 2 : increase 5 °C
from target
temperature
Maintain operation
status
TB_SG1
Domestic How Water
Maintain operation
status
Forced internal
operation off
Target temperature
change automatically
depend on SG Mode
value in install setting
- Step 0 : increase 5 °C
from target
temperature
- Step 1 : increase 5 °C
from target
temperature
- Step 2 : increase 7 °C
from target
temperature
Target temperature
change automatically to
80 °C

Advertisement

Table of Contents
loading

Table of Contents