Preparing For Use; Construction Of The Hydropower Ro S; Interfaces - unGer HydroPower RO S Operating Instructions Manual

Table of Contents

Advertisement

HydroPower® RO S
System overview

Preparing for use

4

Construction of the HydroPower RO S

4.1
1 1
4 4
5 5
7 7
8 8
9 9
10
10
11
11

Interfaces

4.2
1
2 2 3 3
2
3
4
5
6
6
6
7
8
9
10 DI resin filter
11 Pump ventilation slot
11
11
12 Pump Control
13 Power cord
14 Concentrate output
The TDS meter shows the water quality at water outlet for the Pure and the
Boost Mode.
PURE: TDS metre shows the value of the filtered water after RO Membrane
and DI resin. It should ideally show a value of 0. At the latest when it shows
10, the resin should be replaced.
TAP BOOST: TDS metre shows the value of the tap water.
The water meter measures the water flow at the inlet. This is particularly
important for the combination pre-filter, as it must be replaced after approx.
30,000l.
The manometer shows the water pressure behind the pump. Ensure that
the water inlet pressure is at least 1 bar. The optimum is 4 bar, maximum
should not exceed 6 bar. The pump increases the pressure by approx. 4 bar.
Accordingly, the pressure in operation should not exceed 10 bar.
On the front is 1 connection for attaching the hose for the water fed
pole and 1 connection for the water supply. These are standard hose
connections.
Make sure that water cannot flow back into the tap water line, e.g.
through a backflow prevention device.
The water outlet for the concentrate is located at the back. Pour the
concentrate down the drain unsing the enclosed concentrate hose.
Manometer
TDS-Meter
Switch WORK/RO FLUSH
Switch TAP BOOST / OFF / PURE
Water inlet
Water outlet
Water meter
Carbon/sediment combi pre-filter
Membrane
(connection concentrate hose)
12
12
13
13
14
14
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydropower ro20c

Table of Contents