Overview

The INA223 is a voltage output device that monitors current, bus voltage, and power of a supply line by
sensing a voltage drop across a shunt. The INA223EVM is a platform for evaluating the performance of
the INA223 under various signal, shunt, and supply conditions. This document gives a general overview of
the INA223EVM, and provides a general description of the features and functions to be considered while
using this evaluation module.
1.1
INA223EVM Kit Contents
The INA223EVM kit includes the following items:
(1) INA223 PCB evaluation board
(1) SM-USB-DIG Platform PCB
(1) USB extender cable
(1) SM-USB-DIG connector ribbon cable
(1) User's guide CD-ROM
Figure 1
shows all of the included hardware. Contact the Texas Instruments Product Information Center
nearest you if any component is missing. It is highly recommended that you check the TI web site at
http://www.ti.com
to verify that you have the latest versions of the related software.
SM-USB-DIG
Connector
Ribbon Cable
SM-USB-DIG
SBOU125 – June 2012
Submit Documentation Feedback
USB Extender Cable
Figure 1. Hardware Included with INA223EVM Kit
Copyright © 2012, Texas Instruments Incorporated
INA223EVM
Board
INA223EVM User's Guide and Software Tutorial
Overview
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INA223EVM and is the answer not in the manual?

Questions and answers

Table of Contents