Power factor controller

Advertisement

Prophi
6T
®
Section 10
Initial operation
The controller must have been installed before being set up and operated.
All network-specific parameters are fully programmed as described in section 5
(Programming) by being entered in sequence and stored. The controller is then set to
automatic operation with the operating mode key. It is now ready for operation.
Section 11 Maintenance and warranty
The controller should need no maintenance if the operating conditions are observed.
However, it is recommended that a functional check of the controller be performed in
conjunction with the regular checking of the capacitor bank. In the event of any
interventions in the controller during the warranty period, all warranty claims lapse.
- 15 -