Route the Cable

Image
2
3
©2019 Precor Inc. | Seated Leg Curl RSL 619 | Assembly Guide
10
1
roller pad cap ring
1
35
roller pad
47
1
retaining ring, 38 mm
1
11
roller pad cap
8
Tool: Retaining ring pliers
Hardware
Tool: Hex wrench, 8 mm
Hex wrench, 4 mm
Tools: Hex wrench, 8 mm
Open-end wrench, 19 mm
Torque wrench
Snap roller pad cap ring onto roller pad.
Slide roller pad with cap ring onto shaft on pivot arm
with retaining ring and snap on roller cap.
Instructions
To route the cable around the lower pulley on the weight stack tower,
remove the cable retainer. Route the cable around the pulley and then
replace the cable retainer.
To route the cable to the upper pulleys of weight stack tower, remove the
cable retainers, route the cables, and replace the retainers. Tighten to 50
ft-lb (67 N-m) of torque.