Download Print this page

Blast Chiller With Built In Condensing Unit; Blast Chiller With Remote Condensing Unit; Electrical Connection And Earthing; Electrical Power Supply - Tecnodom Attila Series User And Maintenance Manual

Blast chillers

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 24
EN | Blast chillers | User and maintenance manual

1.8 BLAST CHILLER WITH BUILT IN CONDENSING UNIT

The blast chiller is provided with built in condensing unit, therefore it is necessary not to obstruct the blast
chiller/freezer air inlet corresponding to the front grid for the air extraction in order to allow a proper air
circulation. Keep clear the whole blast chiller/freezer perimeter.
We remind you that room temperature rises or insufficient quantity of air to the unit condenser, reduce the
blast chiller performances with possible deterioration of the products and more energy consumption. If the
blast chiller/freezer with built in condensing unit was leant on the side during transportation we suggest you to
keep the product in upright position for at least 8 hours, before switching it on. In this way, you will allow the oil
to flow in all the components, lubricating them again. Afterwards you can proceed with the starting.

1.9 BLAST CHILLER WITH REMOTE CONDENSING UNIT

For what concerns the electric connection, it is necessary to follow meticulously the electrical
rules in force. We remind you that all the operations must be performed by qualified staff only.
The remote condensing unit must be placed far from atmospheric agents, avoiding using the
room where it is installed for storing goods, in order to assure air circulation.
According with the remote condensing unit characteristics, it is necessary to respect the space
from the wall and other obstacles, to ensure always and adequate circulation of air which grants
the correct functioning of the item and an easy maintenance.

2 ELECTRICAL CONNECTION AND EARTHING

2.1 ELECTRICAL POWER SUPPLY

The installation and the electrical connections must be carried out in conformity with the elec-
trical rules in force. These operations must be carried out by qualified staff. The company declines
any responsibilities originated from the no observance of the above rules in force.
See the blast chiller electric diagrams at "APPENDICE - 5" Pag. 140.
Before plugging in the blast chiller, it is necessary to proceed with its complete and careful cleaning, using warm
water with no aggressive detergents and drying with a soft cloth all the humid parts (read with attention the
chapter "3 CLEANING" Pag. 32 regarding the blast chiller cleaning).
In order to carry out a correct plug in you must proceed as follow:
1.
Prearrange a thermal magnetic circuit breaker switch and be sure that the frequency/tension of the line
corresponds to that shown on the blast chiller serial number label (see the label placing "APPENDICE - 1" Pag. 134).
2.
Verify the supply tension at the socket, it must be between +/- 10% when you start the compressor.
3.
We recommend you to install a bipolar-switch (or 4 square pole switch) with contact opening of at
least 3 mm, at the head of the socket. This switch is obligatory if the loading is over 1000 W or when the blast
chiller is connected directly without the use of the plug. The mag thermic switch has to be placed nearby the
blast chiller in order to be well seen by the technician in case of maintenance.
4.
It is necessary that the connection cable section is commensurate to the power consumption of the unit.
The law requires that the unit is earthed; therefore it is necessary to connect it to an efficient earth connection.
5.
30

Hide quick links:

Advertisement

loading