Preparation; Installation - DAIICHI SFLC-110L Instruction Manual

Power line multi-meter
Table of Contents

Advertisement

3. Preparation

3.1 Installation

Mount the unit by the attached M5 nuts to a panel of thinner than 10mm, referring to the following external
dimensions drawing and panel cutout. Fasten these nuts with tightening torque 2.0~2.5N・m.
● Dimension diagram
● Caution on handling
Mount the LCD to obtain an optimum angle, since the contrast changes according to the monitoring angle.
(1) For upper case installation
● Installation
(1) A product is put in a cut hole of a panel from a front.
A body is inserted until it exceeds retaining stopper
of the lower base.
(2) Please fix a product certainly with attached M5
flange nut for installation. Please give a
tightening torque as 2.0~2.5N・m.
(2) For lower case installation
10
SFLC-211-185

Advertisement

Table of Contents
loading

Table of Contents