Page 2
Safety Advice Attention In some countries approval is needed to set up a marquee/tent larger than 75 m2. It is your responsibility to comply with local rules and regulations and to ensure that the marquee/tent is assembled correctly. In case of bad weather conditions, it is your responsibility to ensure the marquee/tent is safely secured and that the marquee/tent does not cause damage to others.
Page 3
Part No Name of the part Length: [cm] Number [pcs.] One-side side bow R One-side side bow L Front one-side bow Side reversible bow Top reversible bow Front horizontal connector Front horizontal connector with coupler Horizontal connector Bows connector Vertical connector (door frame) Post Corner reinforcement Top horizontal reinforcement...
Page 4
Cover/moscitoe net assembly. Assembly Tunnel construction consists of tubular parts, hot-dip galvanised in and out, Cover is assembled with the help of plastic clips. When postfabricated, which prevents them from corrosion. Assemble tubes according to assembling the cover, please cut out the shape of the front the drawing, cut the cover according to the drawing (only the front and the back and back wall and rectandular shape for the doors and wall and doors;...
Page 6
Cover The “Main part of the tunnel” piece is extra long on both sides. The extra cover must be dug into the ground to secure the polytunnel greenhouse. Connect the cover to the frame with the easy clip-on connector system. 2,25m 10,5m 4,5m...
Need help?
Do you have a question about the GH82121 and is the answer not in the manual?
Questions and answers