Download Print this page

Advertisement

Quick Links

Manual
for
Greenhouse
TITAN Classic 480
12-04-2019

Advertisement

loading
Need help?

Need help?

Do you have a question about the TITAN Classic 480 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Dancover TITAN Classic 480 Series

  • Page 1 Manual Greenhouse TITAN Classic 480 12-04-2019...
  • Page 2 Dear customers! After you had decided to purchase a greenhouse you have received a product produced the utmost care. Its especially strong frame is made of special galvanized metal profiles of 1 mm thickness. The greenhouse is easy to assembly due to its simple design. Many different accessories will allow you to implement your ideas.
  • Page 3: List Of Parts

    LIST OF PARTS (1): TITAN Classic 480 Name Length, 4.98m2 7.45m2 Extension 2.35x2.12m 2.35x3.17m 2.35x2.00m No. 1 Side - lower bar 1890 No. 2 Upper bar 1345 No. 3 Fixing profile for doors and a ridge No. 4 Fixtures into the ground No.
  • Page 4 LIST OF PARTS (2): F-profile for 3m greenhouse 1590 F-profile for 2m greenhouse 2120 F-profile for extension 2010 Ridge connection plate Ridger cover F-profile cover Door (upper part) – small DOOR No. 1 Door part with hinges DOOR No. 2 Door part with a handle DOOR No.
  • Page 5 INSTALLATION COURSE: 1. Foundation assembly. To assembly the foundation we use the front and the back parts of the foundation (16) and side parts of the foundation depending on the greenhouse being purchased (13, 14 or 15). All 4 parts should be connected into a rectangle with the foundation angles (17) by manually tightening loosely these entire parts with M5-12 bolts (27), M5 nuts (30) (Fig.
  • Page 6 Fig. 1.6 2. Measure the diagonal of the foundation. Lengths of diagonals must be equal. If diagonals are equal, tighten the bolts of the foundation fully (Fig. 2). Fig. 2 3. Dig holes (25 cm diameter, 40 cm depth) around the whole perimeter of the foundation near fixing points made in the foundation in order to dig in side –...
  • Page 7 Fig. 4.1 Fig. 4.2 5. Preparation to dig the bar into the ground. Tighten the fixtures into the ground (No. 4) to the bottom of the side - lower bar (No. 1) and the door back bars (No. 8) with M5-12 bolts (27) and M5 nuts (30) (Fig. 5). Fig.
  • Page 8 Fig. 7.1 Fig. 7.2 To fix the bars of TITAN Classic 480 greenhouse that is longer than 2.12 m or 3.17 m additional cross bars are used. If greenhouse length is 4.12 m – cross fastening of the bars is connected as follows: 2.12 m (No. 6) + 2.07 m (No.
  • Page 9 Fig. 8.1 Fig. 8.2 Fig. 8.3 Fig. 8.4 9. The assembled and fixed upper bars (No. 2) are tightened to the upper parts of the side – lower bars (No. 1) with M5-12 bolts (27) and M5 nuts (30) with the bar connection plates (12) (Fig. 9.1 – 9.3). Fig.
  • Page 10 Fig. 10.1 Fig. 10.2 11. Tighten the remaining fixing cross bars (No. 5; No. 6 or No. 7) to the upper bars (No. 2) with M5-12 bolts (27) and M5 nuts (30) (Fig. 11.1 – 11.3). Fig. 11.1 Fig. 11.2 Fig.
  • Page 11 Fig. 12.2 13. Tighten the door and back bar holders (No. 9) in the front and at the back of the large angles (19) tightened to the ends of upper bar fixtures (No. 5; No. 6 or No. 7) with M5-12 bolts (27) and M5 nuts (30). This action is carried out analogically in the front and at the back (Fig.
  • Page 12 foundation (16) with M5-12 bolts (27) and M5 nuts (30). This action is carried out analogically in the front and at the back (Fig. 14.1 – 14.4). Fig. 14.1 Fig. 14.2 Fig. 14.3 Fig. 14.4 15. In the front and at the back of the greenhouse tighten the door and back fixtures (No. 10) to the door and back bars (No.
  • Page 13 16. As during assembly of the greenhouse the bolts have been tightened loosely in order to be able to easily move profiles, if needed, the next step is to adjust the assembled frame of the greenhouse with the level, to check the diagonal once again, to tighten bolts fully, and only after that to fill up the holes (Fig.
  • Page 14 Fig. 17.3 Fig. 17.4 18. The side parts of polycarbonate for the back and the front are fixed analogically. We apply the polycarbonate sheet (700x1950 mm) evenly with an edge of an opening near the door and the back bars and evenly with the foundation.
  • Page 15 Fig. 18.3 Fig. 18.4 19. At the front and at the back of the greenhouse above the door and back bar holder (No. 9) polycarbonate- triangle (400x920 mm) covers by its edges side polycarbonate parts and is tightened to the frame with M5-40 bolts (29), M5 nuts (30), and gaskets (31), and to bar connection angles - with M5-20 bolts (28), M5 nuts (30), and gaskets (31).
  • Page 16 Fig. 20.4 Fig. 20.5 21. Wall covering installation. 1050x1485 mm and/or 980x1485 mm (extending sheets) polycarbonate sheets are used to cover the walls. Sheet arrangement side view (for walls and roof): 2.12 m length: 1.05+1.05 m (Fig. 21.1) 3.17 m length: 1.05+1.05+1.05 (Fig. 21.2) 4.12 m length: 1.05+0.985+0.985+1.05 m (Fig.
  • Page 18 The sheets are connected to each other by connecting H-profiles (32), which are tightened to the 3 bar (for the greenhouse of 2.12 m length) from one and another side of the greenhouse by their flat part with M5-40 bolts (29), M5 nuts (30), and gaskets (31). The holes made in the H-profile must match the holes made in the frame.
  • Page 19 Fig. 21.12 Fig. 21.13 22. Polycarbonate roofing installation. 1050x1485 mm and/or 980x1485 mm (extending sheets) polycarbonate sheets are used for roofing. The sheets are connected to each other by connecting H-profiles (33), which are tightened to the 3 bar (for the greenhouse of 2.12 m length) from one and another side of the greenhouse by their flat part with M5-40 bolts (29), M5 nuts (30), and gaskets (31).
  • Page 20 Fig. 22.2 Fig. 22.3 The upper ends of the sheets fit into the ridge (22; 23). Ending F-profiles, which are fixed by F-profile holders (38), are put onto the lower ends of the sheets (39; 40, and 41) (Fig. 22.4 – 22.7). The holders are tightened to the frame with M5-40 bolts (29), M5 nuts (30), and gaskets (31).
  • Page 21 23. Fix the ridge (22; 23 or 24) by means of the ridge fixing holders (37; 42) with M5-40 bolts (29) and M5 nuts (30). At the edges the ridge is fixed by means of narrow holders (37), and in the middle near ridge connection –...
  • Page 22 Fig. 24.2 The door to be mounted on the bars through cellular polycarbonate with M5-12 bolts (27) and M5 nuts (30) must be fully opened and its hinge must be directed outside the opening (Fig. 24.3). Fig. 24.3 Tighten polycarbonate of the lower (960x1230mm) and upper (960x650mm) part of the door to the fixed frame parts of the door with M5-40 bolts (29), M5 nuts (30), and gaskets (31) (Fig.
  • Page 23 Fig. 24.4 Fig. 24.5 25. Tighten the eyelet bolt (35) into a place in tended for that (on the same level with the upper door-window handle). Make a loop from the door opening holder supplied to you (35). Eyelets of all opening-closing doors are made at the handle level with M5 nuts (30) and gaskets (31) (Fig.
  • Page 24: Contact Information

    Contact information Head office: Dancover A/S For more information Nordre Strandvej 119 G please visit: 3150 Hellebæk www.dancovershop.com Denmark National contact Denmark: 70 26 76 20 Spain: 911 436 828 denmark@dancover.com espana@dancover.com UK: 020 8099 7570 Italy: 02 479 21 198 uk@dancover.com...