Download Print this page

Advertisement

Quick Links

Manual
for
Greenhouse
2,5x2,5x2,28m
11-05-2021

Advertisement

loading
Need help?

Need help?

Do you have a question about the ZEN 6.25M2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dancover ZEN 6.25M2

  • Page 1 Manual Greenhouse 2,5x2,5x2,28m 11-05-2021...
  • Page 2 Assembly instruction PRODUCT SIZE(LxWxH):250x250x228cm PLEASE READ CAREFULLY BEFORE ASSEMBLY...
  • Page 3 CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 2 3. Parts List ................Page 3 - 4 4. Door Assembly ..............Page 5 - 6 5. Roof Vent Assembly ............Page 7 - 8 6. Base Assembly ..............Page 9 -10 7. Framework & Glazing Assembly ........Page 11 - 22...
  • Page 4 Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
  • Page 5 Functions and Features: 1. The strong two part eaves beam includes an integral gutter. Downpipes are also included as standard so you can collect rainwater. 2. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra. Automatic Opener Manual Opener 3.
  • Page 6 PART PART L06D L07D L08D L09D door PART PART windowsX2 L01A Part QTY. Part NO. QTY. L01B J56R L18A L11A L01C J56L L18B L01D L12A J90R L02A J90L L02B L16A L02C L16B L02D L02E L02F PART L02G Tools Provided: M6X12 L04A M6X12 Free Tool...
  • Page 7 PART Rubber PART J107 115M Rubber for walls & roof (Provided for glass only) PART J107 Rubber for walls only (Provided for glass only) PC/Glass N0.1...
  • Page 8 Part Part QTY. QTY. L18A L16A L16B L18A L16A Ø4X25 L16B Left Door L18A...
  • Page 9 Part Part QTY. QTY. L18A L18B L16B L18B L16B Ø4X25 L16B Right Door L18A...
  • Page 10 NO. QTY. NO. QTY. Part Part L11A L12A Ø4X16D Step 1 Ø4X8 M4.2X16 Step 2 Step 3...
  • Page 11 L12A L11A L11A L12A L11A is factory fitted to L12A already Four windows are standard...
  • Page 12 PART M6X12 M4.2X16 FRONT BACK About 100mm distance GP934 between two Z08 Fix the base before assembly the greenhouse. This is the way to fix the base. L06D L05D L07D L05D L08D L08D L05D L07D L05D L06D...
  • Page 13 GP934 PART Attention: If glass is chosen, please seal it with rubber(J11) provided after the whole assembly is finished. Rubber is not provided if you choose polycarbonate sheet as glazing panel.
  • Page 14 PART L01A L01B L01B L08D L01A L01A M4.2X16 M6X12 L01B L01A&B 1. Fix the glazing bars (2 x L01A and 2 x L01B) to the cills (L10 and 3 x L08D) with S01 & M01 provided. 2. Fix the cills to the base with Z08, using a powered screwdriver.
  • Page 15 PART L07D L23D 1. Fix 2 x L07D eaves to L01A & L01B, using S01 & M01. M6X12 2. Fix 2 x L23D to L01A & L01B, using S01 & M01. L07D L07D L23D L23D...
  • Page 16 PART L02G L02F L02C L02E L02D L02E L02F L02G L23A L23D L05A M6X12 L02C L02D L02C&D&E&F&G Fix L02C & L02D to cill L10, L02E, L02F & L02G to cill L08D, L02C&D&E&F L02G using S01 & M01. Slide 2 bolts (S01) into L02G bolt channel.
  • Page 17 PART L02A L07D L02A L07D M6X12 L23D Fix L02A (6pcs) to L08D and L07D using S01 & M01. L08D L08D L02A L02A L07D Slide 2 bolts (S01) into each L02A bolt channel. One is to fix L23D, the other is to be used later for fixing L05B L23D Slide the glazing panel Y2 into positions...
  • Page 18 PART L04A M6X12 L04A L04A L04A L04A Fix bracings L04A (6pcs) as above, using S01 & M01. S01X2 L04A L04A L04A L04A Slide the glazing panel Y6 into positions...
  • Page 19 PART L04B L04B L13A L13A M6X12 L13A S01X2 L02C L02E L02D L02F L13A L13A L04B Preload the bolts S01 & M01 to L02E & L02F Fix L13A to L02C & L02D before sliding the panels into positions. with S01 & M01. Slide 2*S01 into the channel of L04B S01X2...
  • Page 20 PART L01D L01C L01C L01D L01C L01D M6X12 L01C&D L01C&D 1. Preload S01 & M01 on L01C and L01D before fixing L01C&D them to L01A/L01B. See figue 1 & 2. 2. Bolt L01C and L01D with plate W01, using S01 & M01 preloaded.
  • Page 21 PART L06D L06D L02B M6X12 Bolt the ridge L06D to L01C & L01D, using S01 & M01. L02B Fix glazing bars L02B (6pcs) to the eaves and the ridge profiles with S01 & M01 Slide 3 bolts (S01) into L06D each L02B bolt channel L02B L02B...
  • Page 22 PART L23D L05B M6X12 Bolt L05B (9 pcs) to L02A & L02B using the S01 bolt placed in the bolt channel earlier. L05B L23D L02B L02A L05B L05B Bolt L23D to L01C & L01D with S01 & M01. Bolt L23D (2 pcs) to L02B using the S01 bolt placed in the bolt channel earlier.
  • Page 23 PART L04A Firstly, slide the glazing panel Y9 into the channel of L02B WINDOW WINDOW M6X12 L04A L04A L02B L04A S01X4 Slide 4 bolts (S01) into each L04A bolt channel. 2 to be fixed with W08, and another 2 to be L11A fixed with L02B.
  • Page 24 PART L09D After the panels and windows are in position, D00R-R put some silicone sealant around to avoid leaking water. D00R-L M6X12 M6X20 L09D DOOR-L DOOR-R L09D L13A L07D When the panels are completely S02X3 inserted, fix gutter profile L09D. Tap it gently into position with a rubber mallet.
  • Page 25 PART L23F J90L J56R L23F J56L J90R J90R J56L J90L J56R M4.2X16 Ø4X16D Ø4X8 J90L/R L23F Fix L23F (2pcs), one end to L14 Fix the cover caps J55 Fix the cover caps (J90L/R) and the other end to L09D through into the ridge profile carefully with Z04.
  • Page 26 Head office: Dancover A/S For more information Lyngevej 16A, Nørre Herlev please visit: 3400 Hillerød www.dancovershop.com Denmark...

This manual is also suitable for:

Gh152240