Operation
Operation
The operation of the PD44 metering valve is controlled
by an external source.
Sequence of Operation
Step 1: Reload
•
Spools shift to the right
•
Material feed inlets (A,B) are opened
•
Materials are transferred into the metering cham-
bers by a pressurized feed system
•
Outlet ports are blocked
•
Metering rods (E) are retracted to a precise position
determining the volume of each material
Step 2: Shift
•
The balanced spool assemblies shift to the dis-
pense position
•
Material path to the mixer inlet is opened
•
Material feed inlet ports (A,B) are blocked
•
Metering rods (E) remain in the retracted position
18
Step 3: Dispense
•
Metering rods (E) extend
•
A and B materials are simultaneously dispensed
from the metering chamber into the disposable
mixer
•
A and B materials are dispensed at the predeter-
mined volume ratio.
Upon completion of the dispense stroke, the metering
rod (E) and spool assemblies shift back to the reload
position.
3A7284B