PowCube 4.8 Overview & Installation
www.sungrowpower.com
1
© 2017 SUNGROW Confidential

Advertisement

loading

Summary of Contents for Sungrow PowCube 4.8

  • Page 1 PowCube 4.8 Overview & Installation www.sungrowpower.com © 2017 SUNGROW Confidential...
  • Page 2 PowCube 4.8 www.sungrowpower.com...
  • Page 3 www.sungrowpower.com...
  • Page 4 Hybrid inverter Key Components Max. PV input power 6500 W Nominal AC output power 5000 W EPS output 5000 W EPS output (with battery only) 3000 W Max. efficiency > 97.7 % Weight 22 kg SH5K Ingress protection rating IP65 Battery Battery type Li-ion (NMC)
  • Page 5 Smart energy management More solar energy is used with an optimised EMS, rather than selling back to the grid at a low price. In the daytime In the evening At night (depleted battery) www.sungrowpower.com...
  • Page 6 Customisable Battery Usage Time and Forced Charge Prioritize local energy supply at high prices, and arbitrage with forced charge to reduce bills. ✓ Set the battery usage time in peak or shoulder time. For example: 08:00–10:00 & 14:00–20:00. ✓ Different usage times can be set on weekdays and weekends. ✓...
  • Page 7 High safety and prolonged battery lifetime • Multi-protections, cell level and battery system level • Smart hibernation technology to maintain the battery’s state of health Multi-level protection Smart hibernation 24/7 protection Battery cell system www.sungrowpower.com...
  • Page 8 DOD > 95 % • High reliability and safety with Samsung cells and Sungrow smart control • Over 95 % depth of discharge to maximise the usable capacity Sungrow battery Some other batteries with a higher DOD with a lower DOD...
  • Page 9: Flexible Installation

    Flexible installation • Modular design of the inverter and battery • Suitable for both free-standing and wall-mountable installations • Simple setup for multiple battery packs Multiple battery packs www.sungrowpower.com...
  • Page 10 One-click online system firmware update • Onsite one-click system firmware update • Remote system firmware update service Onsite Update onsite firmware update UI Remote Update Wi-Fi Ethernet www.sungrowpower.com...
  • Page 11 More usable energy Local Support Over 95 % DOD maximises the usable capacity, with Systematic solution, talk to professional Sungrow highly reliable and safe Samsung cells team for a one stop solution and service www.sungrowpower.com...
  • Page 12 Applications www.sungrowpower.com...
  • Page 13 ✓ Max. off-grid power (PV + battery): 5 kW ✓ Max. off-grid power (battery only): 3 kW; ✓ Max. switch time to EPS mode: 10 s. Q: What if my battery is already depleted from daily cycles when the Menu Settings grid cuts out? Run Info...
  • Page 14 The SH5K can be installed with other PV generation on the same phase, where the other generation can also charge the battery. Menu Settings Run Info Password: ON / OFF 1 1 1 Settings Settings Existing Sys Rate Power Prot. Param Disable Power[W] 00000...
  • Page 15 Menu Settings Settings Bat Usage Time Start Time 1 00:00 Run Info Password: Off-grid Setting End Time 1 24:00 Weekday Usage Start Time 2 00:00 ON / OFF Bat Usage Time 1 1 1 Weekend Usage Settings End Time 2 24:00 Forced Charge Weekend Usage...
  • Page 16 How to activate the zero export on the SH5K? Step 1: Installing the energy meter Export power: 0-100% PV system Meter Main link switch Solar switch Utility Network Sungrow meter grid meter Home Appliance Step 2: Initial Settings -> Zero-export Zero-export Partial Export Pwr[W] 05000 Partial www.sungrowpower.com...
  • Page 17 COM1 COM2 The inverter now has an integrated earth fault buzzer, in addition to the options available to activate the earth fault alarms. If an earth fault occurs, • the buzzer inside the inverter will beep; DO port Inverter Light •...
  • Page 18 • The SH5K+ supports all DRM0-DRM8 modes, reactive power and power quality response. • DRM modes and the resulting import and export limits can be viewed on the LCD. Menu DRM State Run Info Import Limit 100.0% DRED ON / OFF Export Limit 100.0% Settings...
  • Page 19: Installation

    Installation www.sungrowpower.com...
  • Page 20 300mm 300mm 150mm OT M6 For ventilation and accessibility Battery Installation Slot Rail Back view SH5K+ Installation Meter Installation STB5K Installation www.sungrowpower.com...
  • Page 21 2. Install the communication cable. 1. Mount the meter and hang the split core CT to the L line of the mains switch. The arrow on the split core CT must point from the grid to the load. * All cables for the meter are Tighten the wires to terminals A2 included in the package and B2 on the inverter.
  • Page 22 1. Install the electrical cables. 2. Install the communication cable. CANH CANL * Communication cable included in the package www.sungrowpower.com...
  • Page 23 10-15mm 40-50mm Backup control Digital input Grid SH5K AC Load The digital output cable and SBB5K STB5K digital input cable are included with the STB5K. SH5K www.sungrowpower.com...
  • Page 24 It is recommended to secure the battery to the wall after locating for safety. Proceed as follows to install the anchors to both sides of the battery. 2. Drill two holes 1. Mark the two top holes 4. Use the expansion bolt 3.
  • Page 25 5. Move the battery to 6. Unscrew the the installation place four M5 screws and with the help of another remove the top person (it weighs 48 kg). cover. 8. Use the provided M5 7. Install the screws to secure the anchors on each anchors to the battery, side, with the slot...
  • Page 26 A wall-mounting bracket and four expansion plug sets can be delivered on request. 1. Mark six holes 2. Drill six holes provided with the template. M6 expansion bolts in the wall. 3. Drive the expansion 4. Install the bushings for the plugs into the holes.
  • Page 27 6. Hold both sides of the top cover to put the battery on the 5. Install the wall-mounting bracket, with the four bracket. bumps on the bottom aligned into the holes. 8. Install the anchors to each side, with the slot through the bushing.
  • Page 28 Batteries daisy-chained in parallel www.sungrowpower.com...
  • Page 29 • Ensure that the battery is powered off before connection. • The resistance of the DC cables will lower the battery voltage. It is recommended that the DC cable between the battery and the SH5K+ is less than 3 m. •...
  • Page 30 5. Connect the positive cable to the positive “+” 7. If there is more than one battery, connect the terminal and the negative cable to the negative “-“ power cable between the adjacent batteries. The DC terminal. cable between parallel batteries should be as short 6.
  • Page 31 2. Use a sharp object to puncture the com. grommet. 1. Take out the CAN cable from the packaging 3. Lead the CANH and CANL plugs from inside out (the cable on the left is delivered with the through the com. port.
  • Page 32 4. An option e.g. for extension cables is to cut the supplied RJ45 plug before inserting it into the com. port (after the grommet is punctured), or using an Ethernet patch cable (without a plug on it), use the Ethernet wire stripper to strip off 8 mm-15 mm from the protective layer.
  • Page 33 6. Thread the end of the cable with the CANH and 5. Insert the RJ45 plug into the com. port until CANL plugs through one of the com. ports in the makes a clicking sound. Pull the cable bottom of the inverter. outwards gently to confirm whether it is 7.
  • Page 34 8. (Optional): if there is more than one battery, connect the communication cable between the adjacent batteries. If needed, refer to step 4 to add the RJ45 plug to a standard Ethernet cable for parallel communication connection. CAN connection between multiple batteries www.sungrowpower.com...
  • Page 35 There is one point for grounding on each side of the battery. Select either one to ground the battery. The cross-sectional area of the grounding copper conductor should be larger than 6 mm Proceed as follows to ground the battery: 1.
  • Page 36 4. Optional: if there is more than one battery, connect the protective earth cable between the adjacent modules to realise equal potential to reduce the possibility of earth leakage currents and increase safety. Grounding connection between multiple batteries www.sungrowpower.com...
  • Page 37 Descriptions of the LED indicator states www.sungrowpower.com...
  • Page 38 Start Battery Type Battery Type Battery Type (1) The time setting is very important, Other Lead-acid Li-ion Pylon No Battery which directly affects data logging. Set battery type and hh : mm : ss Time Li-ion GCL parameters Li-ion Samsung 07 : 38 : 08 (2) DD, MM, and YY stand for day, Set the time...
  • Page 39 Red LED indicator  Fault Step 2: Find the fault code and read the relevant section of the user manual. Step 3: If unable to resolve the issue, please contact Sungrow 1800 SUNGROW (786 476) or email service@sungrowpower.com.au for advice.
  • Page 40 Monitoring www.sungrowpower.com...
  • Page 41: Ethernet Connection

    Wi-Fi Module Connection Ethernet Connection 5000 1000 1000 3000 With DHCP on (by default), the router will allocate the IP address automatically. Running 16:37 SolarInfo Moni app www.sungrowpower.com...
  • Page 42 5000 1000 1000 3000 Running 16:37 www.sungrowpower.com...
  • Page 43 Information System Battery Grid House www.sungrowpower.com...
  • Page 44 Diagram Month Year Total www.sungrowpower.com...
  • Page 45 Visit www.solarinfobank.com and click Register Register as a Business User (for hybrid systems) www.sungrowpower.com...
  • Page 46 www.sungrowpower.com...
  • Page 47 View multiple  parameters Daily and  weekly reports Monitor power  and energy consumption Monitor inverter  status for proactive servicing www.sungrowpower.com...
  • Page 48 Monitor the power ➢ imported from the grid Patented technology to ➢ record night-time import power even when the inverter is shut down Installers can recommend ➢ the appropriate battery capacity based on customer’s consumption history and/or export power www.sungrowpower.com...
  • Page 49 Hotline Email +61 1800 786 476 service@sungrowpower.com.au info@sungrowpower.com.au www.sungrowpower.com www.sungrowpower.com...