Wiring Guide for LG battery with SH5K / SH5K+
This document describes the wiring and setup procedure for a single LG battery pack.
Refer to manufacturer's documents for multiple parallel connections.
1 Cable Wiring Procedure
1.1 LG Generation II and SH5K
The LG Generation II battery communicates with the Sungrow SH5K V11 inverter via
an Ethernet cable. Prepare the following materials and tools before wiring.
• Ethernet cables,
• RJ45 Crimpable plugs, and
• an RJ45 Crimping tool.
Step 1 Use the crimping tool to cut into
the Ethernet cable plastic sheath about 1
inch (2.5 cm) from the end of the cut cable
(Figure 1).
Step 2 Pinch the wires between your
fingers and straighten them out. Carefully
push all 8 unstripped coloured wires into
the RJ45 plug as shown for T568B and
T568A (Figure 2).
TD_201808_Hybrid_Wiring Guide for LG Battery with SH5K & SH5K+_V1.0
© Sungrow Australia Group Pty. Ltd. All rights reserved.
The information in this document is subject to change without notice.
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
service@sungrowpower.com.au
Figure 1 Cut cable end and leave 1 inch
Corresponding Relationship Between Cables and Pins:
T568B
Figure 2 Colour cable order for the Ethernet
|
www.sungrowpower.com.au
RJ45 plug
T568A
cable
Page 1 of 5