Fault 514: communication error between the meter and the
Fault 514 indicates that there is a communication error between the meter and the inverter.
1 Summary
It is best to call us as soon as possible when any fault is
1.
Is there another inverter on the same phase as the SH5K? If so, go to section 2 (click the number). If the other inverter is
the SH5K+, then check the wiring diagram in section 7 (again, click the number—all section numbers in this document
are links).
2.
Check section 3 to check the communication cable wiring.
3.
Is it a single-phase or three-phase property? Check the appropriate wiring diagrams in sections 4 and 5, respectively.
4.
Is there a long meter communication cable run, i.e. is the inverter far from the main switchboard and the meter? Put the
120 Ohm resistor switch 2 on as per section 6.
5.
Restart after correcting the wiring as per section 8.
6.
To check the installation and wiring is correct, check the power flows on the LCD.
7.
Replace the communication cable as discussed in section 11.
8.
Refer to section 11 for examples of how not to install the meter.
SH5K+_TD_Fault 514 meter communication error_201710
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
service@sungrowpower.com.au
SH5K+
identified. Please check as follows:
|
http://en.sungrowpower.com
Page 1 of 18

Advertisement

loading
Need help?

Need help?

Do you have a question about the SH5K+ and is the answer not in the manual?

Questions and answers

Summary of Contents for Sungrow SH5K+

  • Page 1 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Fault 514: communication error between the meter and the SH5K+ Fault 514 indicates that there is a communication error between the meter and the inverter. 1 Summary It is best to call us as soon as possible when any fault is identified.
  • Page 2 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com 2 Existing System Wiring and Settings If there is another PV inverter installed in the system, make sure the PV inverter is installed at the joint of the solar supply main switch, the load and the Sungrow meter, see Figure 1.
  • Page 3 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Go to the LCD and enable the Existing System function following the steps shown in Figure 2 Settings of the Existing System. Main Screen (Press ENT)→Menu (Press ×2)→Settings (Press ENT)→Input password 111 (Press ENT)→Settings (Press ×10)→Existing Sys (Press ENT)
  • Page 4 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Figure 3: Wiring for the communication cables 4 Single-phase Property Wiring Place the CT clamp after the main switch, or between the utility meter and the main switch. For a gross meter, the CT clamp needs to go over both wires connected to the gross meter for the net of load consumption and solar production, with the arrow of the CT clamp pointing in the direction of current flow.
  • Page 5 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Figure 4: Single-phase Property Wiring SH5K+_TD_Fault 514 meter communication error_201710 Page 5 of 18...
  • Page 6 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Figure 5: CT clamp (single-phase sensor) and line and neutral connections 5 Three-phase Property Wiring Please check the wiring diagram for a three-phase system in Figure 6 Wiring Diagram for a Three-phase Property (with an SH5K+, STB5K and a grid-connected inverter).
  • Page 7 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Figure 6: Wiring Diagram for a Three-phase Property (with an SH5K+, STB5K and a grid-connected inverter) SH5K+_TD_Fault 514 meter communication error_201710 Page 7 of 18...
  • Page 8 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com 6 Extended Communication Cables When the length of RS485 cable is longer than 100 m, push the 120 Ohm (2) switch to “ON” to ensure stable communication, as shown in the figure.
  • Page 9 Figure 4 Wiring Diagram for a Three-phase Property (with an SH5K+, STB5K and a grid-connected inverter). As a last resort, with two SH5K+s you can swap the meters and CT clamps. SH5K+_TD_Fault 514 meter communication error_201710 Page 9 of 18...
  • Page 10 A2 B2 A2 B2 AC plug AC plug Meter Meter Load sub- Load sub- circuit set 1 circuit set 2 Figure 8: Wiring Diagram for two SH5K+s with a Single-phase Property SH5K+_TD_Fault 514 meter communication error_201710 Page 10 of 18...
  • Page 11 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com 8 Restart If the fault persists, restart the inverter. The fault will not clear without restarting the inverter after the meter is correctly installed. The restart procedure is as follows for the SH5K+: 1.
  • Page 12 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com 9 Troubleshooting 9.1 Check whether the meter works Check the PWR/COM LED on the meter (Figure 9). If the LED is yellow and flashing,it indicates that the meter is communicating with the inverter.
  • Page 13 PV power goes to the grid [it will be low or zero with zero export]). 9.2.1 For Incorrect Installation Position Make sure that the 1-phase sensor of the SUNGROW meter should be placed to the phase line (L) from the main switch. If otherwise, the energy flow indicated on the LCD will be wrong.
  • Page 14 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Action LCD Display Explanation Correct Wrong Turn off all the household loads. 4000 4000 4000 All the PV power generation should be exported to the grid, as shown in the 4000 “Correct”...
  • Page 15 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com 9.2.2 For Reverse Sensor Connection Make sure that the arrow on the 1-phase sensor must point away from the grid towards the load. If otherwise, the energy flow indicated on the LCD will be wrong.
  • Page 16 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com Action LCD Display Explanation Correct Reverse Method 1: Turn off all the household loads. 4000 4000 4000 4000 All the PV power generation should be 8000 exported to the grid, as shown in the “Correct”...
  • Page 17 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com 10 Replace the communication cables In only a couple of cases we have handled, replacing the communications cables fixed the issues after checking everything else, even when there was continuity with the original cables. This may be because the cores may have burnt in the original cables, or the resistance increased, with current still flowing but not the full amount.
  • Page 18 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au http://en.sungrowpower.com SH5K A2 B2 Utility Grid Main Switch AC plug Solar 3-phase 1-phase sensor Solar Switch 2 Switch 1 meter Load Figure 10: Do not bypass the meter when wiring the loads and SH5K+...

This manual is also suitable for:

Sh5k