Operating Controls; Display Elements - ABB i-bus KNX IPR/S 3.5.1 Product Manual

Ip router secure
Hide thumbs Also See for i-bus KNX IPR/S 3.5.1:
Table of Contents

Advertisement

ABB i-bus
®
KNX
Device technology
2.6

Operating controls

There are no operating controls on the IP Router Secure.
2.7

Display elements

Three indicator LEDs are located on the front of the IPR/S:
ON
ON
The LED lights for a few seconds after connection of the supply voltage.
After the supply voltage is connected, the LED initially lights up continuously. After approx. 40
seconds, the LED starts flashing until the startup process is complete and the LED lights up
continuously again. Depending on the size of the filter table, this can take 5 to 60 seconds.
LAN/LINK
The LED lights up when the supply voltage is present and the Router is connected to an Ethernet
network.
The LED flashes when the device detects activity on the network, e.g. when data is exchanged.
Telegram
The LED lights up when the Router is connected to a TP network and the startup process is complete
(see "On" LED).
The LED flashes when the device detects activity on the KNX subline TP1 (twisted pair 1), e.g. when
data is exchanged.
18 2CDC502099D0211 Rev. A | IPR/S 3.5.1
LAN/LINK
Telegram

Advertisement

Table of Contents
loading

Table of Contents