QUICK START GUIDE
1U Stackable Distribution Shelf - 19 in Rack
Mount
J2013001 - multiple models - See SPS, CP, or NE Brochure for models.
Distribution shelves may be bused together as shown above in SPS, CP, and NE systems or used as stand-alone
remote distribution (cabled to a power system).
Primary distribution shelves include battery connections. Some models also include battery contactors.
Install the primary distribution shelf immediately above the primary SPS, CP, or NE rectifier shelf (with controller).
Communication cables and interconnecting hardware are included.
Refer to SPS, CP, or NE-S Power System Brochure for details and accessories.
Tools required:
Torque wrench (0-65 in-lb or 0-10Nm)
Sockets - 5/16", 7/16"
Step 1 - Mount Shelf
1.
Reposition mounting ears as required - 4 screws each. Torque to 25 in
lb (2.8Nm) - Phillips screwdriver.
2.
Position the Initial Panel immediately above the rectifier shelf with
Controller. Position Supplementary Panels immediately above another
Panel.
3.
Install Inter-Shelf brackets between adjacent shelves (optional). Torque
to 25 in-lb (2.8Nm) - Phillips
4.
Attach shelf to the frame using a minimum of four screws (two on each
side) - 12-24 (provided).
Torque to 35 in-lb (4Nm) - 5/16" socket.
Page 1
© 2021 ABB. All rights reserved.
Supplementary
Distribution Shelves
Primary Distribution
Shelf
Rectifier Shelves
Screw Drivers (#1 Phillips)
Wire cutters and strippers
screwdriver.
{
SPS System Example
2 Adjacent Shelves
Battery
Connection
options
Cable crimpers
Mounting Ears
Inter-Shelf Bracket

Advertisement

loading

Summary of Contents for ABB J2013001

  • Page 1 QUICK START GUIDE 1U Stackable Distribution Shelf - 19 in Rack Mount J2013001 - multiple models - See SPS, CP, or NE Brochure for models. Supplementary Distribution Shelves Primary Distribution Shelf Rectifier Shelves Battery Connection options SPS System Example Distribution shelves may be bused together as shown above in SPS, CP, and NE systems or used as stand-alone remote distribution (cabled to a power system).
  • Page 2 CAUTION: Verify battery voltage and polarity with a voltmeter before proceeding. Lug Landings - 2 x 1/4” on 5/8” center, 0.7” (18mm) max. tongue width. Connect cables with suitable lugs to -48V and RETURN. Torque to 65 in-lb (7.3 Nm) Page 2 © 2021 ABB. All rights reserved.
  • Page 3 Connect alarm cables between all Distribution Shelves. Supplemental Distribution Shelves Alarm Cable Shelf to Shelf Primary Distribution Shelf Primary Rectifier Shelf (with Controller) Alarm Cable Primary Distribution Shelf to SPS System Primary Rectifier Shelf NE or CP System Page 3 © 2021 ABB. All rights reserved.
  • Page 4 Remove Cover Connect wires with suitable lugs to -48Vdc LOAD and POS RTN landings. Torque per table Replace Cover Cover Screws -48V Lug Landings -Return Lug Landings 2-Circuit Blocks - Battery or Load Page 4 © 2021 ABB. All rights reserved.
  • Page 5 Strip Length: 0.35” (9mm) Verify that fuse is not installed. Strip wires Insert wires into terminal blocks labeled -48VDC and associated RTNS. Tighten screw - 4 in-lb (0.45 Nm). Pull wire to verify. Page 5 © 2021 ABB. All rights reserved.
  • Page 6 Load Breakers (Black handle) in Load Positions. (Right and Left positions) • Remove Retention Cover (2 screws) Verify that each Breaker is OFF. Insert each Breaker fully into its position — oriented as shown below. Page 6 © 2021 ABB. All rights reserved.
  • Page 7 • Remove cover knockouts for installed positions. Replace Cover (2 thumb screws) Turn each Breaker ON GMT Style Fuses Insert each GMT style fuse fully into its position oriented as shown. • Page 7 © 2021 ABB. All rights reserved.
  • Page 8: Reference Documents

    CC848815341 Pulsar Edge Controller Family Product Manual Infinity S Power System (NE-S) Brochure and Ordering Guide Slimline Power System (SPS) Brochure and Ordering Guide Cabinet Power System (CP) Brochure and Ordering Guide Page 8 © 2021 ABB. All rights reserved.
  • Page 9: Safety Statements

    Grounding - Connect the equipment chassis directly to ground. In enclosed equipment cabinets connect to the cabinet • AC service ground bus. In huts, vaults, and central offices connect to the system bonding network. Page 9 © 2021 ABB. All rights reserved.
  • Page 10 Personnel with electronic medical devices need to be aware that proximity to DC power and distribution systems, • including batteries and cables, typically found in telecommunications utility rooms, can affect medical electronic devices, such as pacemakers. Effects decrease with distance. Page 10 © 2021 ABB. All rights reserved.
  • Page 11 QUICK START GUIDE Notes: Page 11 © 2021 ABB. All rights reserved.
  • Page 12 – in whole or in parts – is to purchase orders, the agreed particulars shall prevail. forbidden without prior written consent of ABB. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this Copyright©...