Mounting - ABB ControlMaster CM10 Commissioning Instructions

Universal process controller, 1/8 din
Hide thumbs Also See for ControlMaster CM10:
Table of Contents

Advertisement

C O N T R O L M A S T E R C M 1 0  |  U N I V E R S A L   P R O C E S S  C O N T R O L L E R ,   1/8  D I N   |  C I/C M 1 0 - E N   R E V.   C

Mounting

ControlMaster CM10 is designed for panel mounting.
For NEMA4X protection, a panel thickness of 2.5 mm
(0.1 in) is required.
Referring to Figure 3:
1
Cut a hole of the correct size for the controller in the
panel.
2
Insert the controller into the panel cut-out.
50 (2.0)
97
(3.8)
45
+0.6
–0
(1.8
)
+0.02
–0
91.8
+0.8
–0
(3.6
)
+0.03
–0
14 (0.55)
Panel cut-out dimensions
Figure 3 Mounting dimensions
20 (0.8)
121 (4.8)
141 (5.5)
≥30 (1.18)
11
91.8
(3.6)

Advertisement

Table of Contents
loading

Table of Contents