Preparing The Measurements - Aastra 400 Series User Manual

Planning dect systems as of r1.0
Hide thumbs Also See for 400 Series:
Table of Contents

Advertisement

5. 3. 2

Preparing the measurements

Drawing up a situation plan
• The situation plan records approximately the
number and size of the coverage ranges required.
• The measurements provide the ideal locations for
the radio units.
Radio supply and zone formation
• Create a sensible distribution, e.g. several zones in
the factory and administration (porter's lodge,
basement, etc., in different zones).
• Make a note of the connection capacity required
(number of simultaneous calls) for each zone to de-
termine the number of radio units (see also
density", page
42).
Planning Aastra 400 DECT systems as of R1.0
syd-0457/1.0 – R1.0 – 10.2012
Factory
2 floors
warehouse /
basement
Zone
"Traffic
Zone
1
Zone
Planning
Administration
5 floors
archive /
basement
Porter's
lodge
Zone
5
Zone
3
3
Zone
4
2
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

415430470

Table of Contents