Infinite Transtector DCIPS2B-S-00-B11 Installation Manual page 3

Power supply system
Table of Contents

Advertisement

Installation Manual
| DCIPS2B-S-00-B11 Power Supply System
4.4
Grounding Connection ........................................................................................................28
4.5
AC Input Connection ..........................................................................................................29
4.6
DC Load Connection ..........................................................................................................32
4.7
Battery Connection .............................................................................................................33
4.8
Alarm and Signal Connections ...........................................................................................34
4.9
Symmetry Connection ........................................................................................................36
4.10 Temperature Sensor Connection ........................................................................................37
4.11 Connecting an RS232 Communication Cable ....................................................................38
4.12 Rectifier Installation ............................................................................................................39
4.13 Reinstalling Top Cover ........................................................................................................40
5.1
Commissioning Overview ...................................................................................................41
5.2
Tools and Test Equipment ...................................................................................................41
5.2.1 Tools List .................................................................................................................41
5.2.2 Test Equipment .......................................................................................................41
5.3
Preparation .........................................................................................................................41
5.4
Commissioning procedure ..................................................................................................42
5.5
Test of output voltage .........................................................................................................43
5.5.1 Float charge (U1) ....................................................................................................43
5.5.2 Adjustment of Float Charge, U1..............................................................................43
5.5.3 Boost charging (U2) (if applicable)..........................................................................43
5.6
Battery supervision .............................................................................................................44
5.7
Battery test .........................................................................................................................44
5.8
Commissioning record ........................................................................................................45
6.1
Maintenance .......................................................................................................................46
6.1.1 Checking Terminal Connection ...............................................................................46
6.1.2 Other Requirements................................................................................................46
6.2
Troubleshooting ..................................................................................................................47
Chapter 7 Replacing Modules
7.1
Controller Replacement ......................................................................................................51
7.2
Rectifier Replacement ........................................................................................................51
7.3
Battery and Load Breakers Replacement ...........................................................................52
7.4
Surge Protection Device Replacement ...............................................................................52
A.1 System Layout ......................................................................................................................53
A.2 Installation Details - Connections ..........................................................................................54
A.3 Block Diagram .......................................................................................................................55
A.4 Detailed Dimensions .............................................................................................................56
4
+1 (208) 635-6400 | www.transtector.com
+1 (208) 635-6400 | www.transtector.com
FIGURES
Figure 2-1 Power System Overview ..............................................................................................8
Figure 2-2 Principal of Operation...................................................................................................9
Figure 2-3 Power System With Extended Rear and Top Cover Kit .............................................10
Figure 2-4 Power System with Rear and Top Cover Kit ..............................................................10
Figure 2-5 DCIPS2-3000 Rectifier ...............................................................................................14
Figure 4-1 System Mounting - Cabinet ........................................................................................24
Figure 4-2 System Mounting - Open frame / relay rack...............................................................25
Figure 4-3 Remove Top Cover ....................................................................................................26
Figure 4-4 Remove Extended Cover Kit ......................................................................................27
Figure 4-5 Cable Entry Options ...................................................................................................27
Figure 4-6 Grounding Connection ...............................................................................................28
Figure 4-7 Grounding Connection with Rear & Top Cover Kit .....................................................28
Figure 4-10 AC Cable Connection (1-phase) ..............................................................................30
Figure 4-11 AC Cable Connection (3W+N+PE) ...........................................................................31
Figure 4-12 AC Cable Connection in North American (3W+PE) .................................................31
Figure 4-13 DC Load Connection ................................................................................................32
Figure 4-14 Battery Connection...................................................................................................33
Figure 4-16 ACX External Board .................................................................................................34
Figure 4-17 ACX Relay Board .....................................................................................................35
Figure 4-18 Alarm Connection .....................................................................................................36
Figure 4-19 2-block Symmetry Measurement (for illustration only) .............................................37
Figure 4-20 4-Block Symmetry Measurement (for illustration only).............................................37
Figure 4-21 Temperature Sensor Connection .............................................................................38
Figure 4-22 RS232 Connection ...................................................................................................39
Figure 4-23 Rectifier Installation ..................................................................................................39
Figure 7-1 Unlocking and Removing the Controller.....................................................................51
Figure 7-2 Replacing a Surge Protection Module........................................................................52
TABLES
Table 4-1 Recommended Electrical Cable Size ..........................................................................23
Table 5-1 Float/Boost Charge Voltages .......................................................................................43
Table 5-2 Commissioning Record................................................................................................45
Table 6-1 Connection Torque Setting Check ...............................................................................46
5

Advertisement

Table of Contents
loading

Table of Contents