Reinstalling Top Cover; Chapter 5 Commissioning; Commissioning Overview; Tools And Test Equipment - Infinite Transtector DCIPS2B-S-00-B11 Installation Manual

Power supply system
Table of Contents

Advertisement

Installation Manual
| DCIPS2B-S-00-B11 Power Supply System

4.13 Reinstalling Top Cover

After completing all connections, reinstall the plastic AC cover and/or top cover if Rear and
Top Cover Kit is ordered.
1. Install the plastic and transparent AC rear cover on the power rack with two screws.
2. Place the plastic and transparent top cover on the top of the Distribution Unit. Make sure
that the to cover and Distribution Unit are matched well.
3. If the Extended Cover Kit is ordered, you have to install all assemblies in order:
support assembly
rear cover assembly
AC input cover assembly
40
+1 (208) 635-6400 | www.transtector.com
+1 (208) 635-6400 | www.transtector.com

5.1 Commissioning Overview

Before delivery the system was thoroughly inspected and tested. The following chapter is a
guide to the set-up and operation of the control functions of the system.
NOTE Before starting commissioning read the product description for the individual
components.
WARNING ONLY TECHNICAL STAFF WITH THE NECESSARY EXPERIENCE AND
KNOWLEDGE, WITH REGARD TO THE POWER SUPPLY SUPPORT SYSTEM AND ITS
BATTERIES, MAY PERFORM THE COMMISSIONING. IT IS IMPORTANT TO FOLLOW
ALL SAFETY REGULATIONS.
If there are any difficulties in increasing the voltage to alarm level, the alarm level can be
adjusted to a lower level.

5.2 Tools and Test Equipment

5.2.1 Tools List

The essential commissioning tools are listed in the Installation chapter.

5.2.2 Test Equipment

Multimeter (3½ Digit, 0–1%DC)
Load resistance, to fully load of two rectifiers

5.3 Preparation

Check the installation to ensure the following:
Grounding: The equipment is correctly grounded. The grounding cable size, color and
routing conform to the requirements.
Power: The incoming mains AC power is available for this site. The site power switch
and circuit breakers are clearly labeled. The power cables are correctly terminated.
The site is clean and safe. Check that the system/cabinet is free of any unwanted
objects or insects that may have got in during the installation.

Chapter 5 Commissioning

41