Figure 6-1 Time Sequence Chart For The 10 Send_440 Fb - Siemens SIMATIC S7-400 CP 440 Installation And Parameter Assignment

Point-to-point connection
Table of Contents

Advertisement

Time Sequence Chart for the SEND_440 FB
The figure below illustrates the behavior of the DONE and ERROR parameters, depending
on how the REQ and R inputs are wired.
Figure 6-1
Note
The REQ input is edge-triggered. A positive edge at the REQ input is adequate. It is not
required that the RLO (result of logical operation) is "1" during the whole transmission
procedure.
See also
Diagnostics Messages of the Function Blocks (Page 117)
Point-to-point connection CP 440 Installation and Parameter Assignment
Manual, 09/2007, A5E00057742-03
www.gkbpx.com
Time sequence chart for the 10 SEND_440 FB
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/
Communication via Function Blocks
6.3 Using the Function Blocks
93

Advertisement

Table of Contents
loading

Table of Contents